![Cronyx Qlink-3000/2E1 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/cronyx/qlink-3000-2e1/qlink-3000-2e1_installation-and-operation-manual_2687181011.webp)
Qlink-3000 Multiplexing modem
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901212345678901234567
1234567890123456789012345678901212345678901234567890123456789012123456789012345678901234567890121234567890123456789012345678901212345678901234567
Copyright © 2003 -2005 Cronyx Engineering
11
Section 2. Installation
2.1. Installation place requirements
The device must be grounded before switching on, there is a ground terminal screw on
the front panel provided for this purpose.
When installing the multiplexing modem, allow for at least 10 cm of free space next to
the front panel for interface cable connections.
The ambient temperature must be 0 to +50 °C at 80% humidity, no condensation.
2.2. Delivered items
Delivered items include:
• Qlink-3000 unit
– 1 pc.;
• bracket for mounting the Qlink-3000 unit in a 19” rack
– 2 pcs.;
• self-adhesive stand for the Qlink-3000 unit
– 4 pcs.;
• power supply cable (for the AC model)
– 1 pc;
• removable part of the power supply connector terminal unit
(for the DC model)
– 1 pc.;
• user's guide
–1 pc.
2.4. Cable connections
The front panel of the multiplexing modem contains connectors for connecting physical
links, E1 link(s), Ethernet link, SNMP control link, console, emergency alarm and power
supply.