background image

4

©  2020 HALFEN · INST_WDK 11/15  · www.halfen.com

HALFEN WDK 

Assembly Instructions

Deutsch

English

6. Close the recess

• Close the recess tube 

 with plug 



or



.

Plug without rim WDK-STO 

Plug with rim WDK-STR 

Working times and curing periods

Temperature [°C] in the drill hole

Minimal curing period *

≥ +30°C

10  minutes

≥ +20°C

20  minutes

≥ +5°C

 1 hour

≥ +0°C

 5 hours

≥ −5°C

 5 hours

* values apply for dry concrete in the support element

Cleaning 

•  Clean the drill hole by using a blow-out pump   

and then use a cleaning-brush to remove any dust  . 
Then repeat this procedure (  and  ).

•  The cleaning brush and blow-out pump are ordered separately.

These articles can be ordered directly from HALFEN.
See the current HALFEN price list, section "Bolts, Accessories".

Curing

with wire brush

with wire brush

with compressed air

with compressed air

i

i

B

b

5. Final Assembly

• Screw the nut and washer loosely onto the anchor rod.

•  Adjust the distance (b) by turning the threaded tube 

 

with a socket wrench.

•  After curing tighten the nut and washer with a torque 

of 20 Nm.

If more than two extensions 



are used, additional spacer bolts (e. g. DS13) must be installed at a distance 

of approximately 15–30 cm from the WDK.

Содержание Leviat HALFEN WDK

Страница 1: ...INST_WDK 11 15 Assembly Instructions Montageanleitung Montagehandleiding Instrucciones de montaje Instrukcja monta u Mont n n vod Montaj K lavuzu HALFEN Plastic Wind Anchors WDK D HALFEN Kunststo Wind...

Страница 2: ...ation Plastic wind anchor for precast concrete fa ade panels for push through installation Components WDK E Installation component WDK E VRL WDK E extension WDK M Assembly component WDK M VRL WDK M ex...

Страница 3: ...timber between the fa ade panel and the concrete 4 Installing of the mortar capsule and the anchor rod Clean the bore hole and insert the mortar capsule see also next page Cleaning Anchor bolt M10 thr...

Страница 4: ...a cleaning brush to remove any dust Then repeat this procedure and The cleaning brush and blow out pump are ordered separately These articles can be ordered directly from HALFEN See the current HALFEN...

Страница 5: ...nstellen Anwendung Windanker f r Stahlbeton Fassadenplatten zur Durchsteckmontage aus glasfaserverst rktem Kunststo Bestandteile WDK E Einbauteil WDK E VRL WDK E Verl ngerungsst ck WDK M Montageteil W...

Страница 6: ...Ortbeton als Pu er einklemmt werden 4 Montage M rtelpatrone und Ankerstange Bohrloch s ubern und M rtelpatrone einf hren siehe Darstellung S ubern auf der folgenden Seite Ankerstange Gewinde M10 Edel...

Страница 7: ...r Reinigungsb rste Diesen Vorgang anschlie end wiederholen und Ausblaspumpe und Reinigungsb rste bitte separat bestellen Die Artikel k nnen auch direkt bei HALFEN bezogen werden siehe aktuelle Preisli...

Страница 8: ...il info cn leviat com Czech Republic Business Center afr nkova afr nkova 1238 1 155 00 Praha 5 Tel 420 311 690 060 Email info cz leviat com France 18 rue Goubet 75019 Paris Tel 33 1 44 52 31 00 Email...

Отзывы: