background image

Crestron 

ST-1550 & ST-1550C

 

SmarTouch STS Touchpanels

 

Advanced Settings Screen 

 

Internal Scheduler 

Crestron offers an internal scheduler feature built into the touchpanel. There are 
actually two parts to the internal scheduler: developing a button sequence and 
scheduling a button sequence/function. Each part can be utilized independently of 
the other or combined.  

Sequences and schedules can be programmed into your system by the dealer that 
supplied your system. However, with proper and careful project design by the 
programmer, you can easily make adjustments to the system to better suit your 
personal needs and way of life. Furthermore, you can schedule an event so that it can 
begin at any given date and time and reoccur as you see fit. An event is defined as 
the actions initiated by one sequence or a single button function.  

NOTE:  

Since the exact screen layout for your system is unique, the following 

descriptions for the two parts of the internal scheduler is only a generalization. If you 
decide to take advantage of this feature, consult your dealer for the personal layout 
details of your system.  

Button Sequence Development 

A button sequence differs from macros created from the Control pull-down menu of 
the programming software, because the end user can assign actions to the sequence. 
The purpose of developing a button sequence is to build a consecutive order of 
preselected buttons that runs in real time when a single programmed button is 
touched. The buttons in the sequence can be chosen from any page in the project.  

There are two buttons that must be touched when developing a sequence. One button 
initiates the “learning” function and the other terminates it. These buttons as well as 
a set of programmable buttons may exist on a specialized page designed by the 
programmer. Complete the following steps to assign a programmable button to a 
button sequence. It is assumed that the begin and end “learning” buttons, the 
programmable buttons, and the buttons to be included in the sequence exist in the 
project available to the end user.  

1.  Touch the begin “learning” button. 

2.  Touch a  programmable button.  

3.  Touch the buttons in the sequence at the same speed that you would 

like to be replicated. These buttons can be from any page in the project.  

4.  Touch the end “learning” button.  

User's Operations Guide - DOC. 5804 

SmarTouch STS  

  9 

Содержание SmarTouch STS ST-1550

Страница 1: ......

Страница 2: ......

Страница 3: ...Cleaning 3 Applying Power 3 Configuring the Touchpanel 3 Calibration 4 Preferences Menu 5 Power Management 7 Advanced Settings 8 Internal Scheduler 9 Button Sequence Development 9 Scheduling a Sequen...

Страница 4: ......

Страница 5: ...TRANSMISSION FREQUENCY STS Grayscale 120V AC 433 92 MHz STS C Color 120V AC 433 92 MHz STSI Grayscale 220V AC 433 92 MHz STSI C Color 220V AC 433 92 MHz STSI UK Grayscale 220V AC 418 MHz STSI C UK Col...

Страница 6: ...Views A battery compartment is located on the underside of the unit The compartment holds one Crestron ST BTP rechargeable power pack There are also four rubber feet on the underside of the unit for s...

Страница 7: ...age quality For best cleaning results use a clean damp non abrasive cloth with any commercially available non ammonia glass cleaner Surrounding plastic enclosure may not provide a complete water tight...

Страница 8: ...ettings and Return The Return button saves all of the setup information to EEPROM and displays the main page that has been programmed into your system Calibration NOTE Calibration works best when perf...

Страница 9: ...NOTE Detach the external AC power pack when viewing Battery Life Screen If this pack is attached the gauges read full charge which may be misleading To obtain the Battery Life Screen shown after this...

Страница 10: ...Up Minute Down Minute Up Second Down and Second Up to synchronize the time values in the scratchpad to the current time To save the settings in the scratchpad to the touchpanel s internal clock and re...

Страница 11: ...rogrammed onto any page in the project Consult your dealer To reactivate the touchpanel after the Off or Standby buttons have been utilized simply press the touchscreen Contrast Screen contrast may ne...

Страница 12: ...shown in the illustration Minutes can vary from 0 to 120 where 0 disables the timeout Down and up arrow buttons decrease and increase the timeout respectively NOTE Power Down Timeout should be set low...

Страница 13: ...sonal layout details of your system Button Sequence Development A button sequence differs from macros created from the Control pull down menu of the programming software because the end user can assig...

Страница 14: ...grammed sequence or one that initiates a specific function 3 To set the activation time for the event touch an Adjust Time button from the scratch schedule to open another page Use the increment decre...

Страница 15: ...lable These configurations are identical except for display color the type of input power required and the transmission frequency The table shown in Functional Description on page 1 provides a breakdo...

Страница 16: ...to be connected via the STIRP to each IR OUT port For example in the connection diagram provided the STIRP in IR PORT A is attached to the VCR 4 Repeat the previous step as necessary 5 Apply power to...

Страница 17: ...plied to the system function LEDs on Touchpanel is incorrectly calibrated Enter setup mode and correct Refer to Interface Menu ST CP do not illuminate RF LED on ST CP does ST CP is not receiving power...

Страница 18: ...SmarTouch STS Touchpanels Crestron ST 1550 ST 1550C This page intentionally left blank 14 SmarTouch STS User s Operations Guide DOC 5804...

Страница 19: ...Crestron ST 1550 ST 1550C SmarTouch STS Touchpanels User s Operations Guide DOC 5804 SmarTouch STS 15 This page intentionally left blank...

Страница 20: ......

Отзывы: