DIN-HUB

DIN Rail Cresnet

®

 Distribution Hub

Installation Guide

Hardware Hookup

Make the necessary connections as called out in the illustration below. Apply power after 
all connections have been made. When making connections to the DIN-HUB, use a 
Crestron power supply.

CAUTION

:  Insufficient power can lead to unpredictable results or damage to the 

equipment. Please use the Crestron Power Calculator to help calculate how much 
power is needed for the system (www.crestron.com/calculators).

NOTE

:  Use Crestron Certifed Wire. Cresnet HP wire cannot be used.

NOTE

:  When making connections, strip the ends of the wires approximately 7/16 in 

(11 mm). Use care to avoid nicking the conductors. Tighten the connector to 5 in-lb 
(0.5 to 0.6 N-m). The wire gauge should be 14 to 26 AWG.

Hardware Connections for the DIN-HUB

Description

The DIN-HUB is a DIN rail-mounted Cresnet hub designed to facilitate the configuration of 
large Cresnet networks. DIN rail mounting enables modular installation alongside 
Crestron

®

 DIN Rail lighting and automation control modules and other third-party DIN rail 

mountable devices.

DIN-HUB Specifications 

Installation

CAUTION

:  This equipment is for indoor use only. Mount in a well-ventilated area. The 

ambient temperature must be 32º to 104 ºF (0º to 40 ºC). The relative humidity must be 
10% – 90% (noncondensing).

NOTE

:  Observe the following points:

  •  Install and use this product in accordance with appropriate electrical codes and 

regulations.

  •  A licensed electrician should install this product.

NOTE

:  Before using the DIN-HUB, ensure the device is using the latest firmware. Check 

for the latest firmware for the DIN-HUB at www.crestron.com/firmware. Load the 
firmware onto the device using Crestron Toolbox™ software.

The DIN-HUB is designed for installation on a DIN rail. Refer to the following diagram 
when installing.
  1. Place the top of the DIN-HUB’s rail mount over the top of the DIN rail.
  2. Tilt the bottom of the DIN-HUB toward the DIN rail until it snaps into place.

NOTE

:  When mounting DIN rail products, use a flat-head screw driver to pull the 

DIN rail release tab while snapping the device onto the DIN rail.

To remove the DIN-HUB from the DIN rail, use a small, flat object (i.e., a flat-head 
screwdriver) to pull the DIN rail release tab, and tilt the bottom of the DIN-HUB away from 
the DIN rail.

NOTE

:  Certain third-party DIN cabinets provide space for an informational label 

between each DIN rail row. Crestron’s Engraver software (version 4.0 or later) can 
generate appropriate labels for all Crestron DIN rail products.

Installing the DIN-HUB

Additional Resources

Visit the product page on the Crestron website (www.crestron.com) 
for additional information and the latest firmware updates. Use a QR 
reader application on your mobile device to scan the QR image.

DIN-HUB

Top

DIN rail

(not supplied)

DIN rail 
release

NET HOST

NET PWR INPUT

 24VDC

NET A

HOST

EX

T

G

NET B

HOST

EX

T

G

NET C

HOST

EX

T

G

CRESNET DISTRIBUTION HUB

DIN-HUB

NET

PWR

NET C

PWR

NET

NET B

PWR

NET

NET A

PWR

NET

24 Y Z G

24 Y Z G

24 Y Z G

24 Y Z G

24

Y

Z

G

24

Y

Z

G

24

Y

Z

G

24 Y Z G

 NET PWR INPUT: 

24 Vdc jumpered from NET HOST 

port or external supply. Each port 

provides power to a segment.

NET A: 

Connect to Cresnet 

devices on segment A

NET C: 

Connect to Cresnet 

devices on segment C

NET: 

To control system and 

other Cresnet devices

NET B: 

Connect to Cresnet 

devices on segment B

SPECIFICATION 

DETAILS 

Power Requirements 

 

 

Cresnet Power Usage 

0.6 W (0.03 A @ 24 Vdc) 

Maximum Load per Segment 

75 W (3.13 A @ 24 Vdc) 

Environmental 

 

 

Temperature 

32° to 104 °F (0° to 40 °C) 

 

Humidity 

10% to 90% RH (noncondensing) 

 

Heat Dissipation 

2 Btu/h 