REASSEMBLY

20

Reconnect the radiant element

connector as shown in Fig 20

A

.

Hook slots at the bottom of the plinth

over the plinth fixing tabs on the plastic

feet, as shown in Fig. 20

B

. Slide the

plinth into place as shown in Fig. 20c.

Replace the outer front panel by hooking

onto the two location clips on the top

panel Fig. 20

D

,  20

E

 & 20

F

.  Swing the

bottom of the front panel gently towards

the radiator Fig. 20

G

 and carefully make

sure any excess cable is fed through

into the base of the radiator Fig. 20

H

.

When securing the front panel with the

screws provided, ensure the right hand

corner is secured first to avoid trapping

the cable.

Cut the mains cables to length.  Ensuring the

electricity supply is disconnected, connect the free

end of the mains cable to a suitable double pole switch

adjacent to the radiator – reinstate the electricity supply.

Note – the double pole switch must be in accordance

with the requirements of the wiring rules.

ON NO ACCOUNT

 SHOULD ANY SURPLUS CABLE BE PUSHED INSIDE OR BEHIND THE RADIATOR.

CHECK ALL ELECTRICAL CONNECTIONS FOR TIGHTNESS.

21

22

20

A

20

E

20

F

20

D

20

C

20

B

If the direct acting mains supply connection is to be made

on the left hand side of the radiator the pre-wired cable

must be passed behind the feet and secured using the clips on

the base of the radiator.  Two sets of clips are already attached

to the base of the radiator to allow the mains cables to travel

parallel to each other, if required.  See also Section 4 and Fig. 4.

20

G

20

H

Содержание Eco-Response ER300

Страница 1: ...eing fixed Some modern internal building materials are very low density block and require specialised fixing devices to provide a safe secure installation WARNING If during any reassembly of the radia...

Страница 2: ...tions for Electrical Equipment The radiator is fitted with two flexible cables for connection to the fixed wiring of the premises through suitable switched connection boxes positioned adjacent to the...

Страница 3: ...3 Circuit Diagram...

Страница 4: ...theundersideoftheradiatorensuringitissecure during transit The off peak mains cable will be secured with cable ties Prior to installing the radiator unclip the direct acting mains cable do not remove...

Страница 5: ...hat the mains supply cables are not damaged If they are to be replaced only heat resistant cable must be used min T85 Refer to sections 4 21 and 22 for fitting the off peak and radiant element cables...

Страница 6: ...panel Fig 11D see Fig 11A for wall spacer bracket orientation 11E F Carefully guide the radiator towards the drilled hole and screw part way to the wall Fig 11E 11F 11D 11E 11F 11G NOTE UNDER NO CIRC...

Страница 7: ...UMSTANCES SHOULD THESESCREWSBEREMOVED WITHOUT FIRST REMOVING ALL ENERGY RETENTION CELLS FROM THE RADIATOR Solid brick High density block walls These must be drilled and plugged with the Rawlplug No 10...

Страница 8: ...l packaging Fig 13C taking care not to damage the insulation attached 13A 14 Lift out the elements from the base insulation and rotate forwards DO NOT DISCONNECT THE TERMINALS 14 13B 13c 15 Carefully...

Страница 9: ...stalled DO NOT attempt to reposition the radiator without first unloading the energy retention cells and obtaining the services of a competent electrician 17 16B 19 In its factory default setting the...

Страница 10: ...ng the cable Cut the mains cables to length Ensuring the electricity supply is disconnected connect the free end of the mains cable to a suitable double pole switch adjacent to the radiator reinstate...

Страница 11: ...PCB Bracket from the bottom of the outer front Remove the wire from the connector block and earth screw Using a pair of pliers remove the cable grip from the bracket The replacement cable will be eith...

Страница 12: ...electrical connections are secure Only then phone the customer help line for assistance Reconnect spur and switch on radiator CHECKPROCEDUREFORINSTALLERSFOLLOWINGINSTALLATION 2 To check the radiant pa...