![Creda Eco-Response ER300 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/creda/eco-response-er300/eco-response-er300_installation-instructions-manual_2682068010.webp)
- 10 -
REASSEMBLY
20
Reconnect the radiant element
connector as shown in Fig 20
A
.
Hook slots at the bottom of the plinth
over the plinth fixing tabs on the plastic
feet, as shown in Fig. 20
B
. Slide the
plinth into place as shown in Fig. 20c.
Replace the outer front panel by hooking
onto the two location clips on the top
panel Fig. 20
D
, 20
E
& 20
F
. Swing the
bottom of the front panel gently towards
the radiator Fig. 20
G
and carefully make
sure any excess cable is fed through
into the base of the radiator Fig. 20
H
.
When securing the front panel with the
screws provided, ensure the right hand
corner is secured first to avoid trapping
the cable.
Cut the mains cables to length. Ensuring the
electricity supply is disconnected, connect the free
end of the mains cable to a suitable double pole switch
adjacent to the radiator – reinstate the electricity supply.
Note – the double pole switch must be in accordance
with the requirements of the wiring rules.
ON NO ACCOUNT
SHOULD ANY SURPLUS CABLE BE PUSHED INSIDE OR BEHIND THE RADIATOR.
CHECK ALL ELECTRICAL CONNECTIONS FOR TIGHTNESS.
21
22
20
A
20
E
20
F
20
D
20
C
20
B
If the direct acting mains supply connection is to be made
on the left hand side of the radiator the pre-wired cable
must be passed behind the feet and secured using the clips on
the base of the radiator. Two sets of clips are already attached
to the base of the radiator to allow the mains cables to travel
parallel to each other, if required. See also Section 4 and Fig. 4.
20
G
20
H
Содержание Eco-Response ER300
Страница 3: ...3 Circuit Diagram...