background image

© Copyright 2016, Creative Playthings

NORFOLK II
19944-200 Rev E (01-19)

Page 18

ASSEMBLY INSTRUCTIONS

STEP 31 – Hand Grips (part one):

Place one Hand Grip (CC) flat against the outside face of the 

right back Post as shown. The bottom hole of the Hand Grip 

should be approximately 3-3/4" above the top of the Leg.
With the Hand Grip centered on the face of the Post, mark 

the positions of the holes in the Hand Grip. Drill 1/8" diameter 

pilot holes 1" deep at the marks. Fasten the Hand Grip using 

two 1/4" x 1-1/2" Lag Screws and two 8mm Flat Washers.
Place one Hand Grip flat against the angled face of the front 

right Leg as shown. The top hole of the Hand Grip should be 

approximately 7-3/4" below the top of the Leg.
Mark the positions of the holes in the Grip. Drill and fasten the 

Hand Grip as above.

STEP 29 – Swing Mount (Optional):

If you do not plan to install a 7 foot Swing Beam, do not 

install the Swing Mount.
Find the center of the Main Beam and Wall Support on the 

back of the tower. (The Bolts securing the Center Block are 

at the center of the Main Beam). Mark the Main Beam and 

Wall Support 2" from center. Hold the Swing Mount (MM) 

against the back of the Gym with one edge against the marks 

and align the top of the Swing Mount with the top of the Wall 

Support. Use a level to make sure the Swing Mount is plumb. 
Mark the position of the holes in the Swing Mount on the 

Beam and Support. Drill 3/8" diameter holes through the 

boards at the marks
Fasten the Swing Mount to the Main Beam and Wall Support 

using two 5/16 x 4" Hex Bolt Assemblies as shown at right. 

Install the Swing Beam as instructed by the assembly guide 

included with the Beam.

Wall 

Support

Main 

Beam

Back of Gym

2"

MM

CC

M

STEP 30 — Wall Slats:

Evenly space six Wall Slats (M) between the back Posts. 

Fasten each Wall Slat to the back Wall Support and the back 

Main Beam using four #8 x 1-5/8" Screws. The gap will be 

approximately 3" between slats.
Secure one Wall Slat 27-1/2" from the right front Post 

using four #8 x 1-5/8" Screws. Evenly space two Wall Slats 

between the front left Post and the Wall Slat. Fasten each 

Wall Slat to the front Wall Support and the front Main Beam 

using four #8 x 1-5/8" Screws. The gap will be approximately 

3" between slats.
WARNING:  at  no  time  should  the  opening  between  Wall 

Slats and any other member be greater than 3-1/2" and less 

than 9"; fatal injury could result.

Front of the Gym

3" T

ypical

3" T

ypical

27-1/2"

Roof omitted 

for clarity.

Center 

Line

3-3/4"

7-3/4"

1/4 x  1-1/2" 

Lag Screw

The Swing Mount is 

required for a 7 foot 

Swing Beam only.

Note: Use a C-Wrench or ratcheting box wrench to tight-

en the Lag Screws; a power tool can scar the Hand Grip.

Содержание NORFOLK II

Страница 1: ...t carefully read the entire instruction manual before proceeding with the assembly or use of your new play set Creative Playthings takes great care to design its products with your child s safety in m...

Страница 2: ...ectrical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow mor...

Страница 3: ...cause it to lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures...

Страница 4: ...her 1 4 x 1 1 2 Lag Screw 1 4 x 2 1 2 Lag Screw 1 4 Lock Washer 1 4 Weld Nut 1 4 x 1 1 2 Hex Bolt 5 16 Flat Washer Hole Cap 5 16 Lock Washer 5 16 Lock Nut 5 16 Weld Nut 5 16 x 3 1 2 Lag Screw 5 16 x 4...

Страница 5: ...X 2 1 2 CREATIVE PLAYTHINGS PLAY SETS USE A FEW STANDARD CONNECTIONS BECOME FAMILIAR WITH THESE CONNECTIONS TO EASE ASSEMBLY AND ENSURE A SAFER PLAY PRODUCT FOR YOUR CHILDREN Hex Bolt Weld Nut Assemb...

Страница 6: ...Copyright 2016 Creative Playthings NORFOLK II 19944 200 Rev E 01 19 Page 6 PLAYSET VIEW A B D C E F G J M O Q T U2 V X Y Z BB AA CC DD FF EE HH K II L JJ LL U1...

Страница 7: ...73 102 End Support 2 X 6 X 50 1 8 F 1 35374 102 End Rope Support 2 X 6 X 50 1 8 G 4 35375 102 Corner Post 4 X 4 X 63 1 2 H 1 35378 102 Stringer 2 X 4 X 70 7 8 I 1 35429 102 Tire Stringer 4 X 4 X 70 7...

Страница 8: ...inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creative Playthings Customer Service Oil all metallic moving parts monthly during...

Страница 9: ...one 5 16 x 3 1 2 Lag Screw and Flat Washer in each end The wide surface of the Stringer should be flush with the top of the Platform Ends Fasten the Tire Stringer I to each Platform End nearer the fro...

Страница 10: ...Fasten the End Support E to the Posts on the left side of the gym using four 5 16 x 4 Hex Bolt Assemblies Note the position of the rope hole in the End Rope Support The hole should be closest to the...

Страница 11: ...Support at the back of the assembly D STEP 7 Weld Nuts on Back Insert four 3 8 Weld Nuts into the Main Beam at the back of the assembly in the positions shown Make sure the threads inside the Weld Nu...

Страница 12: ...wn using two 5 16 x 4 Hex Bolt Assemblies STEP 11 Right Front Leg Slide one Left Leg AA into place between the front Main Beam and the front Inside Beam as shown Place the angled face of the leg flush...

Страница 13: ...with the holes in the Main Beam Fasten the Right Leg to the front Main Beam with 3 8 x 4 Hex Bolt Assemblies Fasten the Leg to the Cargo Base Rail as shown using two 5 16 x 4 Hex Bolt Assemblies STEP...

Страница 14: ...n each end of the Main Beams to the Platform Ends using 3 8 x 7 Lag Screws and 3 8 Flat Washers Tighten all fasteners securing the Beams to the Posts STEP 17 Legs to Posts Use a 5 16 diameter drill to...

Страница 15: ...teners Repeat with the other Side Support on the other side of the gym Front of the Gym Front of the Gym STEP 21 Steps Slide the Plastic Steps K into the Slots in the Step Support and the Step Leg Mak...

Страница 16: ...he Leg and Step Support flush with the surface Use a hammer to drive the weld nuts flush and then tighten the Bolts Insert four 1 4 Weld Nuts into the four 5 16 diameter holes in another Rock Board U2...

Страница 17: ...2 Hex Bolt Ridge Cap Part B Ridge Cap Part A STEP 27 Assemble Ridge Cap Align Ridge Cap Part A DD overlapping Ridge Cap Part B EE as shown at right Ensure that the ends of the Ridge Cap parts align b...

Страница 18: ...Mount with the top of the Wall Support Use a level to make sure the Swing Mount is plumb Mark the position of the holes in the Swing Mount on the Beam and Support Drill 3 8 diameter holes through the...

Страница 19: ...OR LOOSE ENOUGH TO FORMALOOP THIS PRESENTS EXTREME DANGER TO CHILDREN Overhand Knot Figure 8 Knot T STEP 34 Tire Swing Locate the Tire Swing Assembly JJ and place it beneath the Gym Platform Make sur...

Страница 20: ...de Fasten using 1 4 x 3 Truss Head Bolts and 1 4 Weld Nuts Note If a framing member is encountered stop drilling after piercing the Deck Board Remove the Slide Mount and Deck Board and insert the Weld...

Отзывы: