pg 8 of 10
REF: T121 - GOAL WITH BASKETBALL NET
Installation Instructions
Attach TOP MESH PANEL between the TOP of 2 LRG POSTS
Using 4 X M10x60mm SOCKET BUTTON BOLTS / 4 X M10 NYLOCS / 4 X COVERED ENDS
5
FIX BASKETBALL FRAME ON TO TOP MESH
Using 4 X M12 x 120mm SOCKET BUTTON BOLTS / 4 X M12 NYLOCS / 4 X COVERED ENDS
6