![Creative Cedar Designs Jungle Fun 3201 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/creative-cedar-designs/jungle-fun-3201/jungle-fun-3201_owners-manual-and-assembly-instructions_2681406020.webp)
Phase 28:
Phase Hardware
Phase Parts
Phase Hardware
18
WARNING:
DO NOT ALLOW ANY
CHILDREN ON THE
BRIDGE UNTIL IT IS
ANCHORED
2 1/2" Deck Screws
A3 (8)
BRIDGE ASSEMBLY
STEP 2:
STEP 1:
63”
1/2” GAP
PF 3829
(8) 2 1/2”
DECK SCREWS
Rope Railing Support must be
plumb and level
Assemble Bridge Platform cont.
HOLE DETAIL
1. Attach Top Step boards as shown in STEP 1
2. Dig (2) 9” diameter holes, 24” deep located as shown in STEP 2
3. Fill holes as shown in HOLE DETAIL
24”
6”
1”
9”
CEMENT
GRAVEL
(2) 1 X 5 X 24 STEPS- PF3829