Cray CS400-AC Скачать руководство пользователя страница 3

About the CS400-AC Hardware Replacement Procedures

The 

CS400-AC Hardware Replacement Procedures

 lists and shows GreenBlade, Subrack, processor/DIMM, and

drive parts for the system. This manual includes procedures for replacing components in GB522 blades and

expansion blades. It also includes procedures for replacing parts in the subrack. Cray personnel or customers

who perform these replacement procedures must first complete Cray CCS hardware training and observe ESD

precautions when servicing this equipment.

Document Versions

HR90-2009: April 2016.

ESD Precautions

Observe electrostatic discharge (ESD) precautions during the entire removal and installation process. Required
apparel includes an ESD smock, ESD shoes, and an ESD wrist strap.

CAUTION:

ESD Precautions

● Observe all ESD precautions. Failure to do so can result in equipment damage.

ESD Smock

Wear a Cray approved static-dissipative smock when you service or handle an ESD-sensitive device. Completely
button the smock and wear it as the outermost layer of clothing. You must have a portion of the smock’s sleeves
in direct contact with the skin of your arms. Skin contact is essential for a dissipative path-to-earth ground through
your wrist strap. Tuck hair that exceeds shoulder length inside the back of the smock.

ESD Shoes

Wear approved static-dissipative shoes or approved dissipative heel straps on both shoes when you service or
handle an ESD-sensitive device. When sensitive equipment is exposed to static discharge, ESD shoes provide a
backup to the wrist straps and grounding cords and help prevent an excessive charge from building up on you
when you contact the conductive flooring. Use dissipative footwear in addition to, not as an alternative to, a wrist
strap.

ESD Wrist-strap

Wear a Cray approved wrist strap when you service or handle an ESD-sensitive device to eliminate possible ESD
damage to equipment. Connect the wrist strap cord directly to earth ground.

Feedback

Visit the Cray Publications Portal at 

https://pubs.cray.com

 and use the "Contact us" link in the upper-right

corner to make comments online. Your comments and suggestions are important to us. We will respond to them
within 24 hours.

About the CS400-AC Hardware Replacement Procedures

HR90-2009 

 

 3

CS400-AC Hardware Replacement Procedures

Содержание CS400-AC

Страница 1: ...CS400 AC Hardware Replacement Procedures HR90 2009...

Страница 2: ...N Replacement Procedures 23 GB522MN Expansion Blade Removal 23 GB522MN Cover Removal 24 GB522MN Cover Installation 25 GB522MN Separate Join Expansion and Compute Blades 25 GB522M and GB522N Exploded...

Страница 3: ...a portion of the smock s sleeves in direct contact with the skin of your arms Skin contact is essential for a dissipative path to earth ground through your wrist strap Tuck hair that exceeds shoulder...

Страница 4: ...efined in the Cray Cluster Supercomputer Support Operations Handbook Troubleshooting Procedures and Requirements Cray Service provides detailed troubleshooting requirements and procedures to diagnose...

Страница 5: ...assis GB522N expansion blade up to 2X K80 101195200 Chassis GB822XA 6X 2 5 HDD bay 002 00372B Fan module assembly air cooled systems for SR5110 SR8204 SR8116 subracks 23101 0295 01 Fan module replacem...

Страница 6: ...y 1100W 80 platinum 2828X 150 00145A Power supply 1600W 80 platinum 2820XT 190 00137A Rail kit 1U 2U full extension tool less 609 6 762MM 800MM MAX 2828X 100993600 RMM4 lite remote management module K...

Страница 7: ...SSD 2 5 6 Gb s 20nm Intel S3500 101178700 Disk drive SATA 300 GB SSD 2 5 6 Gb s 20nm Intel S3500 101125800 Disk drive SAS 300GB 10K 6 2 5 6Gb s 64MB Savvio 101178800 Disk drive SATA 800 GB SSD 2 5 6...

Страница 8: ...nm MLC HHHL P3600 101267300 PCIe3 0 1 6 TB SSD 1 2 height 20 nm MLC HHHL P3600 101268500 PCIe3 0 x16 HCA ConnectX 4 VPI single port QSFP EDR 100 Gb s InfiniBand 101278400 PCIe3 0 x16 HCA ConnectX 4 VP...

Страница 9: ...ord C14 to C13 17AWG 10A 250V 1 2 m 4 ft 085 00361A Power cord C14 to C13 17AWG 10A 250V 1 8 m 6 ft 085 00360A Power cord C14 to C13 17AWG 10A 250V 3 0 m 10 ft 085 00294A Power cord C14 to C19 14AWG 1...

Страница 10: ...9 C14 to C19 250 V 14 AWG 1 8 m 6 ft 15 A 3 0 m 10 ft 13 A 1 5 m 59 in C14 to C13 250 V 10 A 17 AWG 1 2 m 47 in C14 C13 3 0 m 10 ft 1 8 m 6 ft 1 5 m 59 in LS25 to LS26 250 277 V LS 25 LS 26 1 2 m 47 i...

Страница 11: ...GreenBlade chassis The following custom Intel and Mellanox PCI brackets are available for popular expansion add on cards If a bracket is not listed for the card that you want to add please contact yo...

Страница 12: ...TCBT FCBT Brkt 004 01318A 51010 2396 10 Brkt Gasket Kit 002 00398A 90301 0411 00 Mellanox ConnectX 3 MCX353A QCBT Brkt 004 01222C 51010 2395 02 Mellanox Connect IB ConnectX 2 3 MCB192A FCAT MCB194A FC...

Страница 13: ...arches or other lists GB522 Overview Video GB522 Blade Overview 5 52 GB522 Compute Blade Videos Remove and Install Blade Remove and Install Cover Replace Disk Drive Replace Motherboard 4 55 Remove CPU...

Страница 14: ...Short instructional videos for many of the GB522X replacement procedures are available Refer to this page for a complete list of all the videos GB522 Overview and Replacement Videos on page 13 GB522X...

Страница 15: ...lade 3 Connect the cables to the GB522X boot the operating system and close the rear doors of the cabinet GB522X Cover Removal 1 Remove the screw that secures the cover to the chassis Refer to the fol...

Страница 16: ...R D TH E RE AR TO W ARD THE REAR GB522X Exploded Views The following three exploded views of GB522X models show the internal components of each chassis Refer to these illustrations when replacing comp...

Страница 17: ...GB522X Replacement Procedures HR90 2009 17 CS400 AC Hardware Replacement Procedures...

Страница 18: ...rt Numbers on page 5 for available PCIe add on cards Refer to PCI Card Brackets for a list of mounting brackets to be used with the available PCIe add on cards About this task This procedure describes...

Страница 19: ...et is needed to install most PCI cards into a GreenBlade chassis Cray has custom brackets and EMI gaskets for supported add on cards EMI gasket Remove manufacturer s bracket 4 Attach the slot 1 PCI ri...

Страница 20: ...efer to the corresponding number in the figure for each procedure GB522X SSD Replacement High Mount Bracket Removal 1 Remove the GreenBlade chassis from the subrack and place it on a stable ESD safe w...

Страница 21: ...SD and attach it to the bracket with the four M3 x 4 0 screws 9 Attach the high mount bracket drive assembly to the chassis 10 Connect the SATA signal and power connectors GB522X HDD Replacement First...

Страница 22: ...depending on the HDD model 5 Remove the HDD from the drive bracket Installation 6 Install the replacement HDD and attach it to the drive bracket with the four M3 x 4 0 screws 7 Position the HDD brack...

Страница 23: ...Exploded Views GPU Coprocessor Replacement NOTE Short instructional videos for many of the GB522M N replacement procedures are available Refer to this page for a complete list of all the videos GB522...

Страница 24: ...emove the two screws that secure the cover to the expansion chassis Refer to the following figure 2 Press down on the latch button and slide the cover toward the rear of the chassis 3 Lift and remove...

Страница 25: ...xpansion blade The cutouts on the side fit around the pins rivets inside the chassis The pins on the underside of the cover fit into the recesses in the rear panel 2 Slide the cover forward until it l...

Страница 26: ...A R D T H E R E A R Remove 6 screws 2 Unseat the connectors at the front handle end of the blade first 3 Then unseat the connectors at the rear of the blade 4 Pull the blades apart by lifting the exp...

Страница 27: ...rear connectors Lift straight up Pull blades apart Bridge board PCIe Join the Blades 1 Position the expansion blade over the compute blade and line up the PCI connectors and chassis guides 2 Mate each...

Страница 28: ...ures These detailed exploded views show screw locations component placement and the intended assembly of components Detailed step by step information describing the location of components and screws f...

Страница 29: ...ssembly 10P to 8P 6P GPU gasket GB522 GPU bridge board KP Air duct GPU bracket MIC coprocessor card MIC GPU mounting bracket front GB522M MIC chassis assembly GPU front LED switch cable assembly Power...

Страница 30: ...mbly Power connector rear GPU 6P CS GB 522N GPU Coprocessor Replacement Refer to the exploded views of the expansion blades when following these procedures GB522M and GB522N Exploded Views on page 28...

Страница 31: ...d rear GreenBlade mounting brackets to the replacement GPU Coprocessor 3 Connect the power cable connector s to the GPU Coprocessor do this before placing the card in the chassis 4 Position the GPU Co...

Страница 32: ...enBlade chassis Refer to GB522X Exploded Views on page 16 Motherboards are shipped without DIMMs processors or heatsinks installed We recommend swapping DIMMs processors and heatsinks from the defecti...

Страница 33: ...ve the blank InfiniBand IB cover from the front panel 3 Check that an EMI gasket is in position on the inside of the front panel 4 Check that a motherboard insulator is in position in the bottom of th...

Страница 34: ...shipped with processors installed Processors heatsinks and memory DIMMs must be removed from the defective motherboard and installed on the replacement motherboard Remove Heatsink The heatsink is atta...

Страница 35: ...hol 6 Clean the processor with a new cloth dampened with isopropyl alcohol Take your time to prevent any alcohol or thermal paste debris from contaminating the processor socket 7 Use a dry cloth to dr...

Страница 36: ...r needs to be removed in the future Socket with processor 10 Remove the processor Cray Service recommends using a vacuum pen to install and remove processors a Carefully lift the processor out of the...

Страница 37: ...sor into the socket Hold the processor down with your finger as you release the vacuum pencil 12 Close the load plate Carefully lower the load plate down over the processor 13 Lock the load plate a Pu...

Страница 38: ...lly tighten b Proceed to screw B and engage screw threads by giving it two rotations Continue by engaging screws C and D c Continue by giving each screw using the same pattern two rotations each time...

Страница 39: ...stalled Processors heatsinks and DIMMs must be removed from the defective motherboard and installed on the replacement motherboard Remove DIMM 1 Press down on the DIMM latches to unseat the DIMM from...

Страница 40: ...above the socket Align the notch on the bottom edge of the DIMM with the key in the DIMM socket 5 Insert the bottom edge of the DIMM into the socket A When the DIMM is inserted push down on the top ed...

Страница 41: ...tallation CS400 AC Fan Assembly Replacement Prerequisites 002 00372B Fan module 22302 0270 01 Fan interface board 23101 0295 01 Dual fan assembly with wire harness About this task The figure below pro...

Страница 42: ...is procedure describes how to replace either of the two printed circuit board assemblies PCBAs in an iSCB module Reverse the process to replace the PCBAs Note The two PCBAs are connected by a 28 pin c...

Страница 43: ...3 screws from the I O network PCBA Gre enB lad e CO M Plugs into 9 pin connector on CPU board 002 00374C iSCB Module SR5110 SR8204 SR8116 PCBA CPU board 22309 0005 04 PCBA I O network board 22302 031...

Страница 44: ...ane and power backplane in an SR5110 subrack Refer to the following exploded view of the SR5110 that shows screw locations and the intended assembly of parts N O D E N O D E Procedure 1 Power off all...

Страница 45: ...is easier to remove the power backplane plate with attached power PCBA and air duct and midplane as a single unit There are 9 screws in the midplane The screw in the bottom middle of the midplane atta...

Страница 46: ...CS400 Subrack SR5110 SR6110 SR8204 SR8116 sits on a pair of support brackets mounted to the rack These support brackets are included in all preconfigured Cray CS400 cluster supercomputer cabinets A s...

Страница 47: ...t on a pair of support angles that are mounted to the rack The support angles create a shelf The subrack is secured to the vertical rails of the rack with two screws through the mounting holes of each...

Страница 48: ...B module 7 Remove the PSUs 8 Remove all GB522X blades Subrack Removal Front 9 Remove the front bezel 10 Write down the positions of the three DIP switches This will make it easier to properly set the...

Страница 49: ...face and onto the lift platform 2 Position the lift in front of the rack and set the brake 3 Remove any blank filler panel s 4 Carefully slide the subrack off the lift platform and onto the support an...

Отзывы: