Crane NOZ-CHEK Cryogenic Скачать руководство пользователя страница 3

3

www.cranecpe.com

NOZ-CHEK

®Cryogenic

 

Installation, Operation & Maintenance

NOZ-CHEK

®Cryogenic

 Installation, Operation & Maintenance

2.0 INITIAL COMMISSIONING

A Crane Stockham Valve Noz-Chek® check valve is a 
precision built product, specifically designed for the 
operating parameters of your system.

Please observe the following recommendations:

2.1 INITIAL / COMMISSIONING PROCEDURE

(a) Valves will be packed in accordance with our ESB 2155 
APP20, Packing, preservation and site storage procedure 
for cryo valve products.
(b) Care should be taken not to damage any paint work, 
while lifting and moving valves.
(c) Care should be taken not to damage flange / mating 
faces of valves.
(d) Care should be taken to avoid mechanical damage 
to cable / junction box of the Position Switch during 
installation of valve and throughout its working life, (if 
applicable).
(e) Care should be taken to prevent contanmination of 
the valve from dirt,dust or any other foreign bodies from 
entering the valve internals.
(f) Remove any desiccants that have been placed in bore 
of valve prior to installation.

2.2 STORAGE

The valve shall be stored within a sealed polyethylene bag 
to prevent any contaminants from entering the valve.

3.0 INSTALLATION

(a) Direction of Flow

The direction of flow should coincide with the flow 
direction indicated by the cast ‘arrow’ on the body of the 
Noz-Chek®.

(b) Operating Orientation

Ensure that the mounting position is in the operating 
orientation as advised on the Service specification for 
each valve when ordered i.e. horizontal, vertical upwards 
or downwards flow.

(c) Line positioning

Ideally the check valve should have 5 diameters of 
straight pipe before and 6 diameters after the valve. For 
practical reasons this is often not possible.  The valve 
should have as a minimum, 2 diameters of straight 
pipe before and after its location.  The valve will under 
normal circumstances still function as a non-slam check 

valve if fitted closer to other equipment than the stated 
guidelines; however this will normally result in increased 
pressure loss and wear of components. This phenomenon 
is not exclusive to Crane equipment, and should be 
applied to any pipe layout as good practice.

The pressure loss of any piece of piping equipment 
in a system will be affected by the presence of other 
equipment. Pressure loss is an unrecoverable energy loss 
and is the measured decrease in pressure. Measuring 
the pressure drop immediately before and after piping 
equipment will give a higher reading than measuring a 
sufficient distance before and after the piping equipment. 
This is due to pressure recovery after the equipment as 
the flow returns to the full flow area of the pipe. Standard 
flow loop testing requires two diameters of straight pipe 
before the equipment and six after. Most of the pressure 
recovery will occur in the first three diameters after a 
nozzle check valve and a significant amount after two 
diameters. 

Two diameters before the piping equipment will allow 
for the pressure recovery of the upstream equipment. 
The flow will also lose the increase in turbulence caused 
by the disruption of the flow by the equipment. Placing 
equipment too close together will amplify any disruption 
to the flow and make the overall pressure loss to the 
system more than the sum of the individual pressure loss 
of the equipment.

Insufficient straight pipe before the piping equipment 
can also cause a significant increase in the wear of the 
components and reduce the life of the equipment. 
Research has shown that typically five diameters are 
required to stop the effects of accelerated wear with 
the affects increasing in an exponential curve. With the 
geometry of the nozzle check valve it has been shown 
that two diameters is sufficient to make the affects of the 
accelerated wear minimal.

(d) Lifting and Flange Assembly

Always lift the valve by the lifting eyes provided, or 
alternatively a well padded sling.

Ensure that no external pipeline stresses are imposed on 
the valve prior to tightening bolts and pipework mating 
flanges are parallel.

Ensure bolts are tightened correctly.  Always tighten in 
a diagonally opposing bolt sequence, to ensure that all 
bolts apply a uniform load, with the gaskets properly 
installed.

Содержание NOZ-CHEK Cryogenic

Страница 1: ...www cranecpe com OPERATION AND MAINTENANCE INSTRUCTIONS NOZ CHEK Cryogenic Valves brands you trust Crane ChemPharma Energy ...

Страница 2: ...een low pressure loss and quick dynamic response keeping the reverse velocity to a minimum Further development and testing of the valve including updating to state of the art machining techniques and refined material selection means the Noz Chek now fully complies with BS 6364 cryogenic leak rates 1 2 CRYO NOZ CHEK FEATURES Cryogenic Service The Cryo Noz Chek valve is capable of achieving reduced ...

Страница 3: ...oss and wear of components This phenomenon is not exclusive to Crane equipment and should be applied to any pipe layout as good practice The pressure loss of any piece of piping equipment in a system will be affected by the presence of other equipment Pressure loss is an unrecoverable energy loss and is the measured decrease in pressure Measuring the pressure drop immediately before and after pipi...

Страница 4: ...ed by increased velocity in the minimal flow area results in additional force to assist the Disc to open and allows for extra spring loading that facilitates a faster closing time This spring force is balanced in the fully open position of the disc for a given velocity of flow This velocity depends upon the flow imposed by the service conditions and the Specific Gravity of the fluid The Noz Chek I...

Страница 5: ...oved for inspection See Figure 3A 5 3 VALVE DIS ASSEMBLY TYPICAL SEE FIGURE 1 Ensure that area upstream of seat 2 is clean and free from scale Valve should be resting on downstream side ensuring no damage to sealing face Valve may need to be secured to avoid rotation when dis assembling a Remove seat screw 13 and insert the Seat Extractor tool into the slots in the seat to unscrew the Seat 2 count...

Страница 6: ...limit switch 21 is inserted fully into the switch housing and followed by the switch spacer 27 5 The cable of the limit switch 21 should be passed through the cable gland 22 and the cable gland screwed into the switch housing 20 b Magnet housing assembly See Figure 4 1 The 2 magnets 24 are joined together opposite pole to opposite pole and inserted into the magnet housing 25 the switch s sensor de...

Страница 7: ... chek valves for use in Cryogenic Service Doc No ESB 3268 Revision 0 Checked P Burns Revision Date 25 08 20 Page 11 of 16 Crane Stockham Valve Ltd Registered Number L549383 Eng 6 Alexander Road Registered Address 100 Barbirolli Square Cregagh Belfast BT6 9HJ Manchester M2 3AB Phone 44 0 28 90 704222 Fax 44 0 28 90 401582 STOCKHAM VALVE Duo Chek Noz Chek Marlin Flowseal Center Line Item Quantity De...

Страница 8: ...ckham Noz chek valves for use in Cryogenic Service Revision 0 Checked P Burns Revision Date 25 08 20 Page 12 of 16 Crane Stockham Valve Ltd Registered Number L549383 Eng 6 Alexander Road Registered Address 100 Barbirolli Square Cregagh Belfast BT6 9HJ Manchester M2 3AB Phone 44 0 28 90 704222 Fax 44 0 28 90 401582 FIGURE 2 FIGURE 2 ...

Страница 9: ...ription 1 1 BODY 20 1 SWITCH HOUSING 21 1 SWITCH 22 1 GLAND 27 1 SWITCH SPACER FIGURE 3A FIGURE 3B Item Quantity Description 1 1 BODY 20 1 SWITCH HOUSING 21 1 SWITCH 22 1 GLAND 27 1 SWITCH SPACER CRANE Engineered Valve Division Subject Installation Operating and Maintenance manual for Crane Stockham Noz chek valves for use in Cryogenic Service Doc No ESB 3268 Revision 0 Checked P Burns Revision Da...

Страница 10: ... 16 Crane Stockham Valve Ltd Registered Number L549383 Eng 6 Alexander Road Registered Address 100 Barbirolli Square Cregagh Belfast BT6 9HJ Manchester M2 3AB Phone 44 0 28 90 704222 Fax 44 0 28 90 401582 STOCKHAM VALVE Duo Chek Noz Chek Marlin Flowseal Center Line Item Quantity Description 3 1 VALVE DISC 23 1 MAGNET SPACER 24 2 MAGNETS 25 1 MAGNET HOUSING 26 1 GRUB SCREW FIGURE 4 FIGURE 4 Item Qu...

Страница 11: ...oblem 6 3 The valve leaks excessively across seal a The seal is defective b Disc is not seating properly c The Spring Energised seal or Metal C Seal may be damaged d If the valve is fitted with a switch the grub screw may have become loose and the magnet housing is impeding the disc s movement To remedy this clean both threads thoroughly apply an even coat of Jet Lube Thick or Thin thread paste to...

Страница 12: ...Z CHEK PACIFIC VALVES RESISTOFLEX REVO SAUNDERS STOCKHAM TRIANGLE UNI CHEK WTA and XOMOX are registered trademarks of Crane Co All rights reserved brands you trust CPE NOZ CHEK CRYOGENIC IM EN A4 2020_08_26 Crane Energy Global Headquarters 4526 Research Forest Drive Suite 400 The Woodlands Texas 77381 U S A Tel 1 936 271 6500 Fax 1 936 271 6510 Crane Stockham Valve Ltd 6 Alexander Road Cregagh Bel...

Отзывы: