9
STEP 3.
Running Direct Burial Cable from Basin to Control Panel
STEPS & TIPS:
• All Penetrations Through the Basin MUST Be Sealed Watertight
• Cord Grip Penetrations MUST be Made Using a Drill and Appropriate Tap.
• Inlet Not Yet Connected - Shown For Reference Only
• Allow Approximately 7 Feet of Cable Inside the Basin to Allow for Wiring
and Cover Removal
FIGURE 5a
To Field Install Cord Grip:
1.Drill 59/64” hole through
basin wall.
2.
FROM INSIDE
, tap hole
¾” NPT being careful to
run tap to a depth 1-2
threads shallow.
3.Thread cord grip body
into hole
FROM INSIDE
of tank and tighten until
hex shoulder bottoms out
on tank wall.
FIGURE 5b
Содержание BARNES PRESSURE SYSTEMS ULTRA GRIND Simplex 130961
Страница 6: ...6 Location of Basin And Control Panel FIGURE 1 ...
Страница 17: ...17 Basin Package Exploded View FIGURE 17 ...