4
SECTION A: GENERAL INFORMATION
A-1) To the Purchaser:
Congratulations! You are the owner of one of the finest pumps
on the market today. CP&S pumps are products engineered
and manufactured of high quality components. Over one
hundred years of pump building experience along with a
continuing quality assurance program combine to produce a
pump which will stand up to the toughest applications. This
manual will provide helpful information concerning installation,
maintenance, and proper service guidelines.
A-2) Receiving:
Upon receiving the pump, it should be inspected for
damage or shortages. If damage has occurred, file a
claim immediately with the company that delivered the
pump.
MAKE CERTAIN TO RETAIN THIS MANUAL!
A-3) Storage:
Short Term-
CP&S Pumps are manufactured for efficient
performance following short inoperative periods in storage.
For best results, pumps can be retained in storage, as factory
assembled, in a dry atmosphere with constant temperatures
for up to six (6) months.
Long Term
- Any length of time exceeding six (6) months,
but not more than twenty-four (24) months. The unit should
be stored in a temperature controlled area, a roofed over
walled enclosure that provides protection from the elements
(rain, snow, wind-blown dust, etc.), and whose temperature
can be maintained b40 deg. F and +120 deg. F.
(4.4 - 49°C). Pump should be stored in its original shipping
container. On initial start up, rotate impeller by hand to
assure seal and impeller rotate freely. If it is required that
the pump be installed and tested before the long term
storage begins, such installation will be allowed provided:
1.) The pump is not installed under water for more than
one (1) month.
2.) Immediately upon satisfactory completion of the test,
the pump is removed, thoroughly dried, repacked in the
original shipping container, and placed in a temperature
controlled storage area.
A-4) Service Centers:
For the location of the nearest Deming Service Center, check
your Deming representative or Crane Pumps & Systems, Inc.,
Service Department in Piqua, Ohio, telephone (937) 778-8947
or Crane Pumps & Systems Canada, in Brampton, Ontario,
(905) 457-6223.
SECTION B: INSTALLATION
B-1) Location:
These self-contained pumping units are recommended for
use in a sump, lift station or basin. This pump is designed
for submerged continuous duty (15 minutes duty in air
at nameplate horsepower), pumping sewage, effluent,
wastewater or other nonexplosive or noncorrosive liquids not
above 104°F (40°C). Never install the pump in a trench, ditch
or hole with a dirt bottom; the legs will sink into the dirt and
the suction will become plugged.
B-1.1) Submergence:
It is recommended that the pump be operated at the minimum
continuous duty submerged condition (See Fig. 1). The
time required to draw the well down from top of motor to
the minimum submergence level should not be greater than
15 minutes.
NOTE:
Outer shaft seal must be in liquid when
motor is operated, whether motor is submerged or in air.
B-2) Discharge:
Discharge piping should be as short as possible. Both a
check valve and a shut-off valve are recommended for
each pump being used. The check valve is used to prevent
backflow into the sump. Excessive backflow can cause
flooding and/or damage to the pump. The shut-off valve
is used to stop system flow during pump or check valve
servicing.
Crane Pumps & Systems manufactures a break away
fitting discharge system designed to allow the submersible
wastewater pump to be installed or removed without requiring
personnel to enter the wet well. Place the Break Away Fitting
(BAF) in position. Temporarily secure the guide rails in the
upper mounting brackets and locate the base elbow on the
bottom of the wet well. Level the base elbow with grout and/
or shims. Install the intermediate support brackets, if required.
Make sure the rails are in a true vertical position so the pump
will clear the access opening and will slide freely down the
rails into place on the discharge base elbow. Once the rails
are in proper alignment, bolt the base elbow into the floor
of the station and connect the discharge pipe to the elbow.
Connect the movable portion and other supplied fittings of the
BAF onto the pump and lower into wet well. See the Break
Away Fitting manual for more information.
FIGURE 1
Содержание DEMING 7365 Series
Страница 31: ...31 FIGURE 16 FIGURE 17 Vortex Enclosed Items Not Shown 61 62 EXPLODED VIEWS After March 2016 ...
Страница 33: ...33 Notes ...
Страница 34: ...34 Notes ...