English
Universal Vacuum LS 9000 HBS
Original Operation Manual
-16-
11 Assembly for leaf vacuum LS 9000 HBS
Safety during assembly
Delivery, packaging, assembly
The individual parts for the screw connections are attached to the
mounting parts.
ATTENTION!
Squeezing hazard during assembly
Parts of the body may be squeezed when components
are assembled.
Risk of high dead weight
•
Remove machine parts separately from packaging.
Perform transport inspection
•
Check the machine for completeness and potential damage on delivery.
•
The front unit is supplied to the specialist dealer in a partially
assembled condition.
•
Assembly and start-up have to be performed by a specialist dealer
and/or an expert in this field.
Packaging
•
Please dispose of packaging materials separately.
Assembly overview