OPERATION
Commissioning
immediately
after
installation
or after
long periods
of
shut
down the
meter
must be
slowly
purged
of air. This is most
effectively achieved by allowing the liquid to be metered !o
flow through the meter at a slowly increasing rate until the
maximum through put is
achieved
The inter is now ready to be put fin to service and will
accurately in measure all liquid passing through it, provided it
is not operate outside the limits.
METER DIMENSIONS