![CPS BlackMAX VPC Series Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/cps/blackmax-vpc-series/blackmax-vpc-series_operation-manual_2675240006.webp)
OPERATION
VPC Single Stage Series Parts
6
Vacuum Pump Operation
Initial Preparation
1. Install fully charged 18VDC battery onto the
vacuum pump.
-The battery has enough energy to run for
about 45-60 minutes.
2. Check oil level in vacuum pump
3. Connect vacuum pump as shown in
Figure-1.
1. Fully charge the 18VDC Li-on battery.
2. The vacuum pump is shipped without oil in the reservoir. Remove the exhaust / oil fill
cap and add oil until it is seen in the middle of the oil sight glass. Re-secure cap.
3. Remove the 1/4" inlet service port cap, turn on the vacuum pump. After 15 seconds,
replace 1/4 cap back on inlet port.
4. Re-check vacuum pump oil level. Add or remove oil if necessary.
To achieve good final vacuum levels, the oil level should be visually seen through sight glass.
CAUTION: DO NOT RUN THIS EQUIPMENT WITH LOW OR NO OIL. RUNNING THIS
EQUIPMENT WITH NO LUBRICATION WILL CAUSE PREMATURE FAILURE.
VACUUM PUMP IS NOW READY FOR USE.
WARNING: Do not operate on systems under pressure.
Damage to the pump may occur.
Figure - 1