background image

 
 

 

Technical overview 

 
The MF 500 IoT Satellite Bridge provides network server connectivity for up to 100 remote LoRaWAN

™ 

sensors via Inmarsat IsatDataPro (IDP) satellite terminals and is designed to operate with 110 to 240 AC 
mains. 
 

The MF 500 runs an optimized protocol to ensure that airtime satellite costs per sensor are kept to a 
minimum. This makes the MF 500 IoT Satellite Bridge a standalone, low power, low cost solution for 

adding satellite connectivity to your existing COTS LoRa

WAN™ se

nsor devices.  

 
The MF 500 IoT Satellite Bridge supports LoRa

WAN™ version 1.0.2

. The MF 500 IoT Satellite Bridge is 

compatible with a very wide range of commercial off the shelf (COTS) LoRaWAN™ sensors.

 

 

Both the MF-200 LoRaWAN Gateway and the power supply are installed in IP67 rated CPN enclosures for 

harsh environments. 
 
 

Содержание MF-500

Страница 1: ...many CPN Satellite Services GmbH has made every effort to ensure the correctness and completeness of the material in this document CPN Satellite Services GmbH shall not be liable for errors contained herein The information in this document is subject to change without notice CPN Satellite Services GmbH makes no warranty of any kind with regard to this material including but not limited to the impl...

Страница 2: ...he antenna to the pole 6 3 Mount the IDP Terminal to the pole 7 4 Open the CPN Enclosure 8 5 Ensure all circuit breakers are switched off not plugged in 9 6 Insert the antenna cable and connect it 10 7 Switch on plug in all circuit breakers inside the Enclosure 11 8 Check if the system is operating properly 12 9 Close the CPN Enclosure 13 Any questions or suggestions 14 ...

Страница 3: ... touch during power on and immediately after power off Hot surface may cause burns Terminology and Abbreviations PE PE is the abbreviation for Protective Earth and has the same meaning as the symbol Earth Ground This document uses the term earth which is the same as the U S term ground T B D To be defined value or description will follow later AC 230V A figure displayed with the AC or DC before th...

Страница 4: ...costs per sensor are kept to a minimum This makes the MF 500 IoT Satellite Bridge a standalone low power low cost solution for adding satellite connectivity to your existing COTS LoRaWAN sensor devices The MF 500 IoT Satellite Bridge supports LoRaWAN version 1 0 2 The MF 500 IoT Satellite Bridge is compatible with a very wide range of commercial off the shelf COTS LoRaWAN sensors Both the MF 200 L...

Страница 5: ...5 1 Mount the CPN Enclosure to the pole Mount the Enclosure to the pole by using the pole mount located at the backside of the Enclosure ...

Страница 6: ...Mount the antenna to the pole Plug the antenna cable into the antenna and use its pole mount to secure it onto the top of the pole Please make sure that your installation matches antenna cable requirements ...

Страница 7: ... to the pole Plug the IDP cable into the IDP terminal and use its pole mount to secure it onto the Pole We recommend using zip ties to fix the cables to the pole Please make sure that your installation matches cable requirements ...

Страница 8: ...8 4 Open the CPN Enclosure Loosen the 4 marked screws of the cover and remove it from the Enclosure ...

Страница 9: ...9 5 Ensure all circuit breakers are switched off Make sure all circuit breakers are switched off and pointing down ...

Страница 10: ...ert the antenna cable and connect it Insert the antenna cable into Enclosure and connect to the connector located on the bottom left of the MF 200 RF depending on the cable you might need to use an SMA adapter ...

Страница 11: ...11 7 Switch on all circuit breakers inside the Enclosure Connect the AC Power Cable to the main 110 to 240 V AC power source Switch on all circuit breakers ...

Страница 12: ...if the system is operating properly Check if the LED on the power supply and MF 200 LoRaWAN Gateway glows green Please check whether data form the MF 200 LoRaWAN Gateway are received by the MinFarm Portal properly ...

Страница 13: ...13 9 Close the CPN Enclosure Screw in the 4 marked screws of the cover to reinstall it to the Enclosure ...

Страница 14: ...14 Any questions or suggestions Do not hesitate to contact us Version 1 1 Date 17 Aug 2021 Created by Christian Nicolai info cpn de 49 6723 913480 https www cpn de ...

Отзывы: