Remove the main jet, slow jet, needle
seat & air screw.
Clean all the jet & all the hole by using
high pressure air.
FUEL HEIGHT INSPECTION
Measure the height by using a gauge.
STANDARD: 18.5
㎜
CARBURETOR INSTALLATION
The installation sequence is essentially
the reverse of remove.
Adjust the clearance of the throttle valve
cable.
Adjust the air screw.
STANDARD :
1
1
2
1
2
±
round
Adjust the idle speed.
STANDSRD: 1800
±
100 rpm
文件使用
"pdfFactory"
试用版本创建
Downloaded
from
www.ScooterTime.net