![CPG Freno Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/cpg/freno/freno_installation-manual_2674976005.webp)
4
INST
ALLA
TION MANUAL
Modular Rain Garden
Pre-Construction Planning
Before beginning construction, planning will help assure a successful
installation. Here are several important steps to include in your planning
process:
Implement A Safety Plan
Request marking of underground utilities from your local service prior to excavation.
Call 811 or use the state specific information at http://www.call811.com/state-
specific.aspx.
Place construction barriers and hazard markings to limit access to the site while
under construction and divert traffic dangers away from site workers.
Pre-Construction Site Review
Obtain engineering plans for the project and any required permits.
Note any access restrictions requiring special planning, and any overhead wires
or obstructions that may interfere with lifting equipment. Review your equipment
requirements in light of site conditions.
Review plans and note any site issues that conflict with project plans for discussion
with project designers.
Plan how to stage pallets of Freno Modules and other materials for efficient material
handling based on installation configuration and mark the site accordingly prior to
material delivery.
PLANNING