Installation Instructions
9
Site Preparation
Make sure you ensure the following:
• Always put your spa on a structurally sound,
LEVEL
surface. A filled spa can weigh a great deal.
Make certain that the location you choose can support the weight of your filled spa.
• Locate your equipment compartment, which houses all of the electrical components, in a place
where your will have easy access for periodic spa care and maintenance.
• Allow adequate access to all other access panels for service.
Outdoor Ground Level Installation
No matter where you install your new spa, it’s important that you have a solid foundation for sup-
port. If using patio stones, they should be at least two inches thick and twelve inches square. Even
with stones in place, the spa will possibly settle and become unlevel, and may require re-leveling over
time.
Deck Installation
To be certain your deck can support your spa, you must know the deck’s maximum load capacity.
Consult a qualified building contractor or structural engineer. To find the weight of your spa, its
contents and occupants, refer to the Spa Specification chart. This weight per square foot must not
exceed the structure’s rated capacity, or serious structural damage could result.
Your Coyote Spas™ Dealer can help you with local information such as zoning regulations and
building codes.
WARNING! WARNING!
We recommend that the Coyote Spa™ be
installed above ground. Consult a licensed
building contractor to design or evaluate your
custom decking requirements.
9