County Materials Corporation Summit Stone Скачать руководство пользователя страница 2

7

6" (at least)

fi rebox area

front

back

base course

6" (at least)

6" (at least)

6" (at least)

Once the concrete pad is constructed and cured, 
begin installing the base course of the fi rebox. 
Align the fi rebox in the center of the pad and 
slightly closer to the back.

5

79 /" H x 84 /" W x 54 /" D

(grate not included)

Completed Summit Stone 
Standard Outdoor Fireplace

8

Concrete Adhesive 

Apply recommended landscape 
adhesive to secure each Summit 
Stone unit. See your Summit Stone 
sales representative for information.

Note: 

Landscape adhesive should  

only be used with Summit Stone units, 
not on fi re brick.

Concrete Adhesive

Summit Stone

®

Tumbled Landscape Units

6

Concrete base must be a minimum 5" thick
and rebar reinforced

Recommended Practices:
Base Preparation

6" (min.)

Содержание Summit Stone

Страница 1: ...l cut lintel pad units left and right 3 5 6 Concrete Block and 5 3 Concrete Soaps for base 4 75 2 thick Fire Brick for the firebox 5 1 10 lb pail of Heat Stop II refractory clay for adhering fire brick 6 1 47 x3 x3 steel lintel 3 1 5 4 6 2 2 The Summit Stone Standard Outdoor Fireplace Package of Components Includes Note Adhesive is sold separately Approximately 10 12 tubes of adhesive will be used d...

Страница 2: ... D grate not included Completed Summit Stone Standard Outdoor Fireplace 8 Concrete Adhesive Apply recommended landscape adhesive to secure each Summit Stone unit See your Summit Stone sales representative for information Note Landscape adhesive should only be used with Summit Stone units not on fire brick Concrete Adhesive Summit Stone Tumbled Landscape Units 6 Concrete base must be a minimum 5 thi...

Страница 3: ...g should occur away from the fireplace area to avoid stains from dust or residue Summit Stone Tumbled Landscape Units 12 Install Summit Stone units around the firebox three courses high This is the elevation for the fireplace hearth 10 Install and glue Summit Stone units laid on their sides to form the perimeter of the firebox Place but do not glue the 6 concrete block supplied with the components on ...

Страница 4: ...age of firebox It may be necessary to cut fire brick to properly fit the interior of the firebox 16 Note Allow room for a 1 gap between the bottom row of the firebox and the front hearth This will help balance the Summit Stone units laid perpendicular on the top of the hearth 14 Construct and glue the front hearth and side pillars on each front corner of the firebox using Summit Stone units ...

Страница 5: ... and side pillars You cannot complete the side pillars until the front arch is in place Refer to the procedures for Installing an Optional Front Arch explained later in this guide for complete instructions Optional Front Arch Modification 20 18 Continue installing units to complete firebox walls following typical fireplace installation procedures ...

Страница 6: ...y adhesive supplied with the components should only be used to adhere the surfaces of fire brick to each other Do not adhere fire brick to the Summit Stone units left and right special cut lintel pad units p p p p 21 24 Make sure the two specially cut left and right Summit Stone lintel units are placed properly on both sides of the firebox top front to accommodate the lintel 22 ...

Страница 7: ...ve the lintel and around the sides and back 25 Install steel lintel supplied with the components across the top of the firebox at the front to support units above 28 Install Summit Stone units laid flat around the top perimeter of the firebox to serve as the base of the chimney 26 cut unit ...

Страница 8: ...onate and eliminates extra cutting of units 32 Note An arch feature will require approximately 35 additional Summit Stone units depending on the arch design You will also need the following materials 1 Plywood sheet 4 x 8 Diamond blade saw for cutting concrete Saws for wood 2 2 x 4 Wood spacers Nails 15 20 Wood shims Optional Front Arch Modification 30 Because of tapering the chimney will require u...

Страница 9: ...r Once these units are in place continue installation as directed for the back and sidewalls of the firebox interior fire brick and steel lintel Instructions for completing the arch will follow Installing an Optional Front Arch 36 Nail 2 x 4 spacer boards between the plywood templates to hold them together Insert the plywood arch template inside the fireplace opening resting on the hearth plywood tem...

Страница 10: ...s determined position of wood shims plywood templates Installing an Optional Front Arch 40 Summit Stone Tumbled Landscape Units Replace wood shims with 2 cut Summit Stone wedges per space Glue all units and wedges in place around the arch replace wood shims with 2 Summit Stone wedges plywood templates Installing an Optional Front Arch 38 Summit Stone Tumbled Landscape Units Cutting of Summit Stone...

Страница 11: ...mpletely When ready install chimney units according to the guidelines It may be necessary to cut the front row plywood templates of chimney units to fit around the arch and maintain a stepped out appearance Installing an Optional Front Arch 44 30 min Seasoning an Outdoor Fireplace 30 60 90 Rule Build a small wood fire in the fireplace that will burn for approximately 30 minutes and extinguish itself ...

Страница 12: ...not guarantee the performance or structural integrity of this fireplace Use only industry accepted materials cements and adhesives when constructing an outdoor fireplace Always observe building codes and local bylaws 45 60 min Seasoning an Outdoor Fireplace 30 60 90 Rule After sitting for one day start a fire capable of burning for 60 minutes Let the fire extinguish itself and allow the unit to cool c...

Отзывы: