Custom Outdoor Fireplace with 

Optional Arch Modifi cation

Note:

 When reviewing 

installation guidelines, plan for 
any modifi cations before starting 
construction of fi replace.

Note: 

 The outdoor fi replace kit shown is constructed with Summit Stone “B” (7-1/4” x 10-7/8”) 

units. Other Summit Stone unit sizes can also be used. For added design fl exibility, any of the 
other fi ve sizes of Summit Stone landscape units can be substituted. Refer to the Summit Stone 
Fireplace Kit Material Calculation Worksheet for units required if using multiple sizes.

1

Summit Stone

®

Tumbled Landscape Units

ww

ww

w

w

w.

w.

w

w.

co

co

co

co

oun

un

u

u

u

ty

ty

ma

ma

te

te

ri

ri

ri

ri

ri

al

al

s.

s.

s.

s.

s.

co

co

co

c

c

m

©2015 County Materials Corporation

Summit Stone

®

 

Standard Outdoor Fireplace 
Installation Guidelines

4

(Est. Weight:  8000 lbs.)

The Summit Stone Standard 
Outdoor Fireplace consists of 
320 Summit Stone Units and the 
following Package of Components: 

1)

   (14) Summit Stone special cut units

 ( / &  /)

2)

  (2) Summit Stone special cut

lintel pad units (left and right)

3)

  (5) 6" Concrete Block and 

(5) 3" Concrete Soaps for base

4)

  (75) 2 /" thick Fire Brick for the 

fi rebox

5)

   (1) 10 lb. pail of Heat Stop II 

refractory clay for adhering fi re brick

6)

   (1) 47" x 3 /"x 3 /" steel lintel

3

1

5

4

6

2

2

The Summit Stone Standard Outdoor Fireplace 

Package of Components Includes: 

Note:

 Adhesive is sold separately. Approximately 10-12 

tubes of adhesive will be used, depending on the quantity 
applied per Summit Stone unit.

Summit Stone

®

 Standard Outdoor Fireplace

2

Standard Outdoor Fireplace Installation Guidelines 
Concrete Pad Preparation 

 

Before beginning any outdoor fi replace project, make sure to check 
with your local building inspector regarding open fi re regulations in 
your area.

It is recommended that any Summit Stone fi replace be installed on a 5" 
thick concrete pad with rebar reinforcement and proper footings. The 
pad should extend at least 6" beyond all sides of the proposed fi replace.

Note:

 The fi replace weighs approximately 8,000 lbs., including Summit 

Stone units, steel lintel, fi rebrick and incidental block.

©2015 County Materials Corporation

Standard Outdoor Fireplace Installation Guidelines

Summit Stone

®

Tumbled Landscape Units

Содержание Summit Stone

Страница 1: ...l cut lintel pad units left and right 3 5 6 Concrete Block and 5 3 Concrete Soaps for base 4 75 2 thick Fire Brick for the firebox 5 1 10 lb pail of Heat Stop II refractory clay for adhering fire brick 6 1 47 x3 x3 steel lintel 3 1 5 4 6 2 2 The Summit Stone Standard Outdoor Fireplace Package of Components Includes Note Adhesive is sold separately Approximately 10 12 tubes of adhesive will be used d...

Страница 2: ... D grate not included Completed Summit Stone Standard Outdoor Fireplace 8 Concrete Adhesive Apply recommended landscape adhesive to secure each Summit Stone unit See your Summit Stone sales representative for information Note Landscape adhesive should only be used with Summit Stone units not on fire brick Concrete Adhesive Summit Stone Tumbled Landscape Units 6 Concrete base must be a minimum 5 thi...

Страница 3: ...g should occur away from the fireplace area to avoid stains from dust or residue Summit Stone Tumbled Landscape Units 12 Install Summit Stone units around the firebox three courses high This is the elevation for the fireplace hearth 10 Install and glue Summit Stone units laid on their sides to form the perimeter of the firebox Place but do not glue the 6 concrete block supplied with the components on ...

Страница 4: ...age of firebox It may be necessary to cut fire brick to properly fit the interior of the firebox 16 Note Allow room for a 1 gap between the bottom row of the firebox and the front hearth This will help balance the Summit Stone units laid perpendicular on the top of the hearth 14 Construct and glue the front hearth and side pillars on each front corner of the firebox using Summit Stone units ...

Страница 5: ... and side pillars You cannot complete the side pillars until the front arch is in place Refer to the procedures for Installing an Optional Front Arch explained later in this guide for complete instructions Optional Front Arch Modification 20 18 Continue installing units to complete firebox walls following typical fireplace installation procedures ...

Страница 6: ...y adhesive supplied with the components should only be used to adhere the surfaces of fire brick to each other Do not adhere fire brick to the Summit Stone units left and right special cut lintel pad units p p p p 21 24 Make sure the two specially cut left and right Summit Stone lintel units are placed properly on both sides of the firebox top front to accommodate the lintel 22 ...

Страница 7: ...ve the lintel and around the sides and back 25 Install steel lintel supplied with the components across the top of the firebox at the front to support units above 28 Install Summit Stone units laid flat around the top perimeter of the firebox to serve as the base of the chimney 26 cut unit ...

Страница 8: ...onate and eliminates extra cutting of units 32 Note An arch feature will require approximately 35 additional Summit Stone units depending on the arch design You will also need the following materials 1 Plywood sheet 4 x 8 Diamond blade saw for cutting concrete Saws for wood 2 2 x 4 Wood spacers Nails 15 20 Wood shims Optional Front Arch Modification 30 Because of tapering the chimney will require u...

Страница 9: ...r Once these units are in place continue installation as directed for the back and sidewalls of the firebox interior fire brick and steel lintel Instructions for completing the arch will follow Installing an Optional Front Arch 36 Nail 2 x 4 spacer boards between the plywood templates to hold them together Insert the plywood arch template inside the fireplace opening resting on the hearth plywood tem...

Страница 10: ...s determined position of wood shims plywood templates Installing an Optional Front Arch 40 Summit Stone Tumbled Landscape Units Replace wood shims with 2 cut Summit Stone wedges per space Glue all units and wedges in place around the arch replace wood shims with 2 Summit Stone wedges plywood templates Installing an Optional Front Arch 38 Summit Stone Tumbled Landscape Units Cutting of Summit Stone...

Страница 11: ...mpletely When ready install chimney units according to the guidelines It may be necessary to cut the front row plywood templates of chimney units to fit around the arch and maintain a stepped out appearance Installing an Optional Front Arch 44 30 min Seasoning an Outdoor Fireplace 30 60 90 Rule Build a small wood fire in the fireplace that will burn for approximately 30 minutes and extinguish itself ...

Страница 12: ...not guarantee the performance or structural integrity of this fireplace Use only industry accepted materials cements and adhesives when constructing an outdoor fireplace Always observe building codes and local bylaws 45 60 min Seasoning an Outdoor Fireplace 30 60 90 Rule After sitting for one day start a fire capable of burning for 60 minutes Let the fire extinguish itself and allow the unit to cool c...