4
www.costway.com
5
www.costway.com
Swing Assembling
1.Swing arrives in 4pcs tubes,
and 2 hanging ropes, a
swinging body for assembly.
2.Put the swinging body on the
floor, and put the 4 Velcro covers
in the direction of black mat.
3.Insert the arched tube with foam
into the sleeve firstly.
10.Fix it by washer and nut
11.Use wrench to tighten it.
12.Cover the Velcro back
13.Top looking and appearance
14.Assembly finished, and it is
ready to swing
15. You can stand up and
grasp the handle and surfing
swing.
7.Connect the body as an oval
platform.
8.Put the screw bolt through the
Velcro cover
9. Insert the screw bolt into the
holes of frame tube. Make sure
the holes are aligned.
4.Put the arched tube like this.
5. Insert the straight tube into the
sleeve; connect
two tubes by small socket to big
socket. Repeat it until all the tubes
connected.
6.Repeat step 4 and 5 until all the
tubes are inserted.
Please note that the last
tube inserted should be
the arched one.