11.1.Insert the Sliding Tube (O
2
) into the Sliding Tube (O1), See Fig11.1.
11.2 Sliding the Roof (X1/X2) over the Sliding Tube (O1/O
2
), fix the sliding tubes onto the Back
Beam (C1/C2/C3) with bolts (EE). See Fig11.2-11.4.
11.3. Sliding the Roof (X1/X2) over the Sliding Tube (O
4
) and fix it with bolts (CC), fasten the Sliding
Tube (O
4
),
. Sliding the Roof (X1/X2) over the Sliding Tube (O
3
)
,
See Fig11.5-11.6.
11.4. Install one end with pulley of the Sliding Tube (O
3
) onto the Track (M1/M2/M3) based on the
sequence shown in Figure 1-5, then connect the Sliding Tube (O
3
) to the bolt (DD) with Nut (MM),
See Fig11.7-11.8.
11.5. Insert the Pipe Plugs (GG) into the two ends of the track, and lock them with bolts (AA)
,
See Fig11.9.
O1
O
3
M1/M3
M1/M3
GG
AA
CC
O
4
O
3
1
2
3
4
5
X1/X2
Fig11.6
Fig11.8
Fig11.7
Fig11.9
DD
MM
21
O
4
AAx4 CCx
2
X1x1 X2x1
O
3
x
8
O1x2
O
2
x2
MMx10 EEx4 GGx2
O
4
x
2