M2
I1
J1
R
J2
I2
Step10
M2
M3
M1
19
HH
HH
M1/M2/M3
I1/I2/J1/J2/R
Fig10.2
10.1 Connect the Connector (Y1) and the two adjacent track
s
(
M1/M2/M3)
to the Arched beam at
the same time, and fix it with bolts (HH).
Fix the other end of the track
(
M1/M3)
to the beam with
bolts (HH).
Don't tighten the bolts.
10.2 Fix the Connector (Y2) to the arched beam with bolts (HH). Don't tighten the bolts.
Note: After the junction of the two rails closing up and aligning, then tighten all bolts.
Fig10.1
HH
HH
I1
M1
M2
M2
M3
J1
R
J2
I2
HH
M1/M2/M3
HH
Y2
Y1
M1/M2/M3
M1x1
M2x2
M3x1
Y1x3
Y2x3
HHx22