CORNING Pretium Скачать руководство пользователя страница 9

STANDARD RECOMMENDED PROCEDURE 003-649 | ISSUE 5 | JANUARY 2009 | PAGE 9 OF 10

=

3.11

Installing a Buffer Tube Fan-out Kit

Loose-tube fiber optic cable can be connectorized using Buffer Tube Fan-out (BTF) kits (purchased 
separately).

Step 1:

Terminate the fibers according to the instruction provided with the BTF kit.

Step 2:

Slide drawer back completely and route buffer tube behind the flanges on the drawer and 
secure with cable ties. Do not tighten cable ties. Route buffer tube around the radius 
control guides.

Step 3:

Secure the BTF body to the tray using a cable tie (Figure 11).

Step 4:

Continue routing the fiber and install connectors into the adapters at the rear of the 
connector panels.

3.12

Closing the Housing

Step 1:

Lift up on stop latches and 

slide drawer toward the front of the housing

 to make sure 

cable is not stressed. If necessary, readjust cable strain-relief to prevent stress on fibers.

Step 2:

Slide drawer back to original position.

Step 3:

If previously removed, slide the cover back in the retaining flanges on top of the housing. 
Push the plunger fasteners to secure.

Step 4:

Close the front and rear doors.

3.13

Routing Patch Cords

Install patch cords as specified on planning diagrams. Route patch cords through the routing clips on 
either side at the front of the housing (Figure 12).

Provide enough patch cord slack to allow the connector panel tray to slide to the back and forward 
positions without violating the minimum bend radius of the patch cord.

Record patch cord routing information on the identification (ID) label provided.

BTF Body

Flanges

KPA-1199

Figure 11 — Fan-out Fiber Routing

Содержание Pretium

Страница 1: ...ble Strength Member 6 3 7 Grounding Armored Cable 6 3 8 Installing Preconnectorized Cable into Connector Panels 6 3 9 Installing Closet Connector Housing Pigtail Modules 7 3 10 Installing Preconnector...

Страница 2: ...h utility racks and occupies one rack space Factory stubbed units are also available Contact your customer service representative to order other mounting configurations or to purchase accessories that...

Страница 3: ...e Cover Removing the cover is optional but is recommended to ease installation Step 1 Open front and rear doors Step 2 Locate the plunger fasteners at the front of the unit under the housing cover and...

Страница 4: ...onsult the cable specification sheet for the cable you are installing Do not bend the cable more sharply than the minimum recommended bend radius Do not apply more pulling force to the cable than spec...

Страница 5: ...er Pieces of glass fiber are very sharp and can damage the eye easily CAUTION Wear safety gloves o protect hands from accidental injury when using sharp instruments Step 1 Attach the cable to the stra...

Страница 6: ...ook directly into the end of a fiber that may be carrying laser light Laser light is invisible and can damage your eyes Viewing it directly does not cause pain The iris of the eye will not close invol...

Страница 7: ...e trays Splice per the instructions provided with the splice tray Figure 8 Step 3 If you intend to splice using an external splice housing route slack around the radius control guides and through the...

Страница 8: ...the unit and replace with connector modules purchased separately Step 4 Install MTP connectors into the MTP adapters at the rear of the connector modules Figure 10 Route fiber as shown and loosely sec...

Страница 9: ...Housing Step 1 Lift up on stop latches and slide drawer toward the front of the housing to make sure cable is not stressed If necessary readjust cable strain relief to prevent stress on fibers Step 2...

Страница 10: ...perties of their respective owners Corning Cable Systems is ISO 9001 certified 2003 2004 2007 2009 Corning Cable Systems All rights reserved Published in the USA 4 Maintenance Clean external component...

Отзывы: