![CORNING Pretium Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/corning/pretium/pretium_operating-manual_2668671005.webp)
STANDARD RECOMMENDED PROCEDURE 003-649 | ISSUE 5 | JANUARY 2009 | PAGE 5 OF 10
=
3.5.2 Using Cable Ties
If at least 10 m (33 ft) of outside plant cable is routed within an environmentally controlled building
where temperature fluctuation is minimal, securing the cable sheath is adequate strain-relief.
CAUTION:
Wear safety glasses to protect your eyes from accidental injury when
handling chemicals and cutting fiber. Pieces of glass fiber are very sharp and can
damage the eye easily.
CAUTION:
Wear safety gloves o protect hands from accidental injury when using
sharp instruments.
Step 1:
Attach the cable to the strain-relief bracket with cable ties in two places as shown in
Figure 6.
Step 2:
Allow room on the bracket to strain-relieve the cable strength member, if present.
Bracket Orientation for Top Cable Entry
Bracket Orientation for Bottom Cable Entry
KPA-1196
Figure 5 — Strain-relieve Using UCC
Cable Ties
Yarn (If Present)
Strength Member
Flat Washer
U-shaped
Washer
KPA-1197
Figure 6 — Strain-relieve Strength Member