Section 7 – Maintenance
41
a. This will help locate the top of the hood support which will keep the hood level.
8. Project a line from the fascia mounting location (fascia mounting channel or fascia side of the
tube) from one guide to the other.
9. Mark a line at the support centerline along the fascia line.
10. Prepare the location of the attachment point of the support(s) prior to installing the barrel. This will
make installing the support much easier when the time comes to attach it to the lintel/header or
ceiling.
a. Hold the support in place at the determined location and mark the mounting hole
locations.
b. Drill holes in the construction.
11. Attach the fascia side hood support to the lintel/header or ceiling to be sure the mounting holes
were located properly.
12. Proceed to the
“Barrel and Brackets”
section.
13. Once the barrel, brackets, curtain are installed, and necessary testing was done on the unit,
install the Coil Side hood support.
Hood and Fascia Installation
Note:
Ensure limits for motor are set before proceeding to install hood or Fascia (see Curtain
Alignment section).
1.
Mount fascia starting with right side first. Fasten the fascia accordingly using the fasteners provided.
Ensure hoods with multiple sections overlap correctly.
2.
BJ Fascia will be installed after guides, brackets, and shaft have been installed.
a.
Mount Fascia starting with right side first.
Figure 7.33 – Fascia Hood Installation (FOW)
MAKE BOTTOM FLANGE
FLUSH WITH JAMB
ON EACH SIDE
SLIDE LEFT SIDE FASCIA
INTO AND ON TOP OF
RIGHT SIDE FASCIA
GUIDES MOUNT
ON TOP OF FASCIA