Cornelius COR20RRTM Скачать руководство пользователя страница 7

Reach-In Refrigerator Installation Manual

© 2004, IMI Cornelius Inc.

- 7 -

Publication Number: 630460252INS

Always check the amperage rating of the condensing unit and the complete cabinet to determine the size 
power line required. (See the serial tag on the cabinet.) Any excessive amperage drawn due to low 
voltage will affect the performance and shorten the life span of your cabinet.

C

ABINET

 S

TART

 U

P

A qualified refrigeration service person should be present to make a complete check prior to start-up. 
Before turning on the on/off power switch:

1.

Check all refrigeration lines for damage which may have occurred during shipping or installation.

2.

Check that all wires are clear of the fans and that the fan blades turn freely.

3.

Check the unit compartment for oil leaks.

4.

If the compressor is mounted on external springs, be sure the hold-down nuts have been loosened.

5.

Clean the interior of the cabinet with mild soap and rinse with a warm baking soda solution (one cup 

baking soda to one gallon of water). 

6.

Dry the interior completely.

After the cabinet is operating

Be sure the compressor cycles three times and the proper temperature is achieved before loading 
product into the cabinet.

While waiting for the cabinet to achieve the proper temperature and cycles three times, open the door(s) 
to see if the light goes on. With the door(s) open, push the door switch button(s) to see if the lights go out.

I

NSTALL

 

THE

 A

DJUSTABLE

 S

HELVING

Each cabinet’s pilaster has been installed with knurled-head machine screws and are easily removed for 
cleaning. The shelves and shelf clips (4 clips per shelf) are packed in the cabinet. To insert a clip, place 
the top of the clip in the pilaster while pushing in and down. Insert the bottom of the clip in the pilaster. 
Repeat until all clips are in the desired locations. Place the shelves on the clips, checking to be sure all 
four corners of each shelf are level and supported by the four shelf clips.

L

OAD

 

THE

 P

RODUCT

 

IN

 

THE

 C

ABINET

Before loading the cabinet, be sure the unit has cycled three times and the cabinet has achieved the 
desired temperature. Each cabinet is designed to perform within certain temperature and humidity 
requirements, based on ambient factors. 

Remember - a commercial refrigerator is an electrical mechanical device subject to failures. Check the 
thermometer readings frequently to prevent loss of product due to radical changes in temperature. An 
optional audio alarm is available from the factory for cabinets where frequent temperature checks aren’t 
practical or product value requires this notification to prevent product loss.

FIGURE 10

 

 

 

 

 

 

 

Содержание COR20RRTM

Страница 1: ...cabinet from the carrier remove the front and side panels to inspect for concealed damage 1 If concealed damage is found call the carrier immediately save all crating materials and file the necessary...

Страница 2: ...aks in the compressor compartment If you find oil leaks call a qualified service person before operating the unit If no oil leaks are found wait 1 2 hour before operating the unit REMOVE THE CRATE AND...

Страница 3: ...eful when mounting legs or moving the cabinet To install the legs Heavy adjustable legs are provided with all top mounted cabinets so the cabinet may be leveled accurately and to allow room to clean b...

Страница 4: ...NSATE DISPOSAL SYSTEM WARNING The condensate disposal system is designed to dispose of the water from the evaporator only under normal operating conditions When cases are used with ice or when additio...

Страница 5: ...e floor and plug in the electric condensate pan Be sure drain tubing with trap drains into the pan Type 2 Install the drain tube elbow to the drain tube Attach the evaporator pan and cradle to the rea...

Страница 6: ...defective electrical appliances The cabinet comes with an on off power switch located in the unit compartment in compliance with U L requirements Consult the specification sheet and wiring diagram fo...

Страница 7: ...g for the cabinet to achieve the proper temperature and cycles three times open the door s to see if the light goes on With the door s open push the door switch button s to see if the lights go out IN...

Страница 8: ...4 IMI Cornelius Inc WIRING DIAGRAMS COR20RRTM FIGURE 11 PERIMETER HEATER TEMP CONTROL FAN MOTOR BLACK WHITE WHITE RED COND UNIT WHITE BLACK LIGHT BLACK WHITE BLACK RED RED WHITE BLACK BLACK GREEN WHIT...

Страница 9: ...EEN BLACK WHITE RED WHITE GREEN BLACK WHITE RED BLACK BLACK WHITE RED GREY GREY RED GREEN FEED 4 X 4 ELECT BOX SWITCH EVAP PAN UNIT COND BLACK WHITE MULLION CANOPY CONNECTION BAFFLE CONNECTION WHITE F...

Страница 10: ...I Cornelius Inc COR40RRTMD FIGURE 13 PERIMETER HEATER TEMP CONTROL FAN MOTOR BLACK WHITE WHITE RED COND UNIT WHITE BLACK LIGHT BLACK WHITE BLACK RED RED WHITE BLACK BLACK GREEN WHITE JUNCTION BOX BUTT...

Страница 11: ...REEN BLACK WHITE RED BLACK BLACK WHITE RED GREY GREY RED GREEN FEED 4 X 4 ELECT BOX SWITCH EVAP PAN UNIT COND BLACK WHITE MULLION CANOPY CONNECTION BAFFLE CONNECTION WHITE FAN MOTOR CONTROL WHITE BLAC...

Страница 12: ...ACK BLACK WHITE RED GREY GREY RED GREEN FEED 4 X 4 ELECT BOX SWITCH EVAP PAN UNIT COND BLACK WHITE MULLION CANOPY CONNECTION BAFFLE CONNECTION WHITE FAN MOTOR CONTROL WHITE BLACK RED BLACK POWER DOOR...

Отзывы: