
TigoBridge SOM Integration Quick Guide
All information presented in this document is confidential and for internal use only.
Copyright
2019, CoreTigo Ltd
.
Page
4
of
11
1 Overview
1.1 Objective
This document describes the design process for integration TigoBridge SOM on top of a Carrier
board.
The process of integrating TigoBridge SOM includes the following steps:
1.
Mechanical design:
a.
Placing the BTB connectors in the correct positions.
b.
Considering TigoBridge SOM dimension for placing it inside the host enclosure.
c.
Connecting and routing of the antenna cable.
2.
Electrical design:
a.
TigoBridge SOM pin out description and connectivity
b.
Application and implementation
1.2 TigoBridge SOM Integration folder content
Provided with this guide please find the following files:
1.
“TigoBridge.STEP” SOM STEP file
2.
Example data sheet for UFL to SMA cable: “IPEX_MHF_Connector.pdf”
3.
Example data sheet for a whip antenna: “W24-SSMA.pdf”
4.
DXF file of “TigoBridgeMatingBoard.DXF” pcb (for correct positioning of the BTB
connectors)
5.
Mollex BTB connectors data sheet – “533531671.pdf”, “533532071.pdf”