
Copyright by CORE INSIGHT, INC.
This user manual contents may change without pre-notification.
11
in additional repair charge.
Before performing any maintenance on emitter points,
shut down the power on the ionizer. Allow a minute for
high voltage power supply to discharge.
B.
Personal Safety
Do not wear wrist straps when access this ionizer units for
maintenance reason as regular ESD control method and
remove power connection from AC line source. Be sure
that no wrist strap requires when service access to high
voltage operational system.