Page 14
Procedure
1.
Place the upright weldments
in their install locations laying
down.
2.
Install a one-sided corner
connector onto an upright
weldment, then secure the
upright weldment to the corner
connector using two open-
ended wrenches and the
supplied hardware. Repeat this
step three more times for a
total of four one-sided corner
connector upright weldment
assemblies.
3.
Units with T connectors do the
same and have two T connector
upright weldment assemblies
each.
Fig. 24
4.
Connect the four corner
connector assemblies built
earlier using two of the 18’
tubes and the supplied
hardware. (See Fig. 25)
Note: Units with T connectors
see Fig. 26.
Fig. 25
Fig. 26
Содержание 9-ABR-3636-60
Страница 1: ...OWNER S MANUAL CORE HEALTH FITNESS ALPHA BAG RACKS...
Страница 10: ...Page 9 81 00005 THROWDOWN VERTICAL LOGO 731 0517 STICKER WARNING BOLT DOWN Notice images are not to scale...
Страница 17: ...Page 16 8 Units with external bag hangars secure them to the 9 beam assemblies Fig 30...
Страница 25: ...Page 24 THIS PAGE INTENTIONALLY BLANK...
Страница 26: ...Page 25 THIS PAGE INTENTIONALLY BLANK...
Страница 27: ...Page 26 THIS PAGE INTENTIONALLY BLANK...