12
13
5. Drill Bit & Lag Screw.
It is important to use a
3
/
16
-inch drill bit.
Since the lag screw’s diameter is
5
/
16
-inches, the threads of the lag
screw will firmly grip the wood stud.
6. Secure Lag Screw.
After the hole has been drilled into the stud,
insert and tighten a lag screw until it is secure.
7.
Socket Wrench.
Tighten the lag screw with the socket wrench.
8.
Level.
Level the H2 unit and mark the middle and lower
mounting holes.
9. Drill Other Holes.
Hold the H2 to the side and drill the other
two mounting holes.
10. Secure Lag Screws.
Tighten the lag screws until they are secure.
11. Socket Wrench.
Tighten both lag screws with the socket wrench.
12. Finish and Repeat.
Repeat this process for each of the other
two H2 units.