12
Check the door frame is vertical and is centrally positioned between the corner post and wall channel.
From inside the enclosure, in the positions shown, drill through the corner post and wall channel into the fixed panels using a
3mm drill bit,
do not drill too deep!
Fix using 6 x 10mm screws and screw caps.
ø 3
mm
From inside
10mm
9
8
Position the top rail onto the top of the
'fixed panels'. Adjust the position of the
fixed panel brackets as required.
Line up the holes and fix using 2 x 13mm
screws.
13mm
Inside