Lighting Start-Up Operation
1. Plug ballast power cords into an outlet or power
source and turn the switches on (Figure 10).
2. Verify that all lamps are lit and functioning
properly (Figure 9).
4. Make sure that the cooling fans are on and blowing
across the unit.
Wet/Dry Filter Start-Up Operation
1. Open canopy and remove filter cartridge. Rinse
thoroughly with cool freshwater and reinstall in
1st chamber.
2. Rinse substrate, sand, gravel, rocks, driftwood,
plants and ornaments and add to aquarium.
3. Prepare aquarium water (saltwater/freshwater).
Make sure water is at room temperature to
prevent condensation.
4. Open canopy and slowly add water to the
aquarium. Make sure to fill aquarium up to the
lower edge of the top moulding (Figure 11).
5. Plug water pump power cord into an outlet or
power source. Pump will raise water level in
aquarium section and drain into wet/dry section
(Figure 12).
OPERATION
FIGURE 10
FIGURE 11
FIGURE 12
FIGURE 9
Air Inlet
Cooling Fan Air Discharge
Compact Fluorescent
Lamps
LED Bar
Switch
WARNING:
Do not obstruct cooling fan air input and cooling fan
air discharge.
Keep canopy vents clean from dust and debris.
Wet/Dry Section
Aquarium Section
Top Moulding
Fill Level
Fill Level
Wet/Dry Section
Aquarium Section