
Section 363-719-141
July 31, 1997
Revision 01
Page 24
PairGain Engineering - Plant Series
PG-Flex FCS-719
8.5
Bypass Pairs.
If subscriber drop testing is required, connect the metallic bypass pairs (Figure 7).
Note that n is:
1 for System 1
2 for System 2
3 for System 3
4 for System 4
Do not connect metallic bypass pairs between PG-Flex systems or to other
digital loop carrier (DLC) systems.
1
For System n, connect the metallic bypass pair from the main distribution frame (MDF) to wire
wrap posts BYPASS_n_T (Tip) and BYPASS_n_R (Ring) on the COTS.
2
Repeat step 1 for each system installed.
Figure 7. Connecting the Metallic Bypass Pair
Содержание 150-1319-41
Страница 32: ......