![CopperOptics 150-1319-02 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/copperoptics/150-1319-02/150-1319-02_manual_2666215025.webp)
Revision 01
June 2, 1997
Section 363-719-102
PG-Flex FCS-719
PairGain Engineering - Plant Series
Page 23
8.4
Bypass Pairs.
If subscriber drop testing is required, connect the metallic bypass pairs (Figure 7).
Do not connect metallic bypass pairs between PG-Flex systems or to other
digital loop carrier (DLC) systems.
1
For System 1, connect the metallic bypass pair from the main distribution frame (MDF) to wire
wrap posts BYPASS_1_T (Tip) and BYPASS_1_R (Ring) on the COT shelf.
2
Repeat step 1 for Systems 2, 3 and 4 using these pin pairs:
BYPASS_2_T, BYPASS_2_R for system 2
BYPASS_3_T, BYPASS_3_R for system 3
BYPASS_4_T, BYPASS_4_R for system 4
Figure 7. Connecting the Metallic Bypass Pair