
13
Mounting and Operating Instructions
Brillant LED Self contained luminaire for ceiling mounting
1883...1884 LED CGLine
The following can be started and displayed with the test-button:
- function test ON
- duration test ON/OFF
- duration test delayed
- settings of the emergencylight operating time with subsequent identification of the luminaire short
address (when data bus is connected and the CG-Controller has issued short addresses).
The delayed duration test is displayed if the luminaire is not charged without interruption for 24h or if an
duration test is started within the 24h.
For further details see the operating manual of the CG-Controllers CGLine 400 or the CGLine Web-
Interface.
Autarkic operation
Without the CG-Controller CGLine or the CEAG CGLine Web-Interface the luminaire starts after the
initial installation/mains connection the function test weekly and a duration test every three months.
After mains returns the emergency operation will stay for approx. 1 minute (delay on mains return)!
6.3 Dim-Level
Setting the AC-lightness by using the test button
- Push the test-button for t < 1 sec.
- After the first flash of the LED the lightness can be changed by pushing the button again in 3 steps.
Every push of the button raises the lightness for 1 step. If the hightest step is reached it begins again
with the lowest.
6.4 Operation mode
TEST
green yellow red
Position of the switches S1-X:
duration of e.l. no. of LEDs
Type of luminaire
S1-1 S1-2 S1-3 S1-4
1 h
4
1883…1884 LED CGLine
0
0
0
0
3 h
4
1883…1884 LED CGLine
1
0
0
0
1 h
12 or 16
1883…1884 LED CGLine
0
0
1
0
3 h**
12 or 16
1883…1884 LED CGLine
1
0
1
0
**) preset
printed cir-
cuit board
3h 1h
ON
OFF
1 2 3 4
Содержание CEAG Brillant 1883 LED GGLine
Страница 1: ......
Страница 16: ...400 71 860 093_A xxx 10 11 WK...