background image

MobileCool WP1

© 201

7

 COOLSHIRT SYSTEMS, 170 Andrew Drive, Stockbridge GA 30281

Office : 800-345-3176                           Fax: 678-289-4325 

 www.coolshirt.com

Operation (Continued):

1)

In the Water Bladder add ½ an ounce of Maintenence Additive ( #

5003-0001

 ).

Add 16

 

ounces of clean water.

2)

Fill the remainder of the Water Bladder with cubed ice.

3)

Seal the Water Bladder containing the 

endurance ice

, the Maintenance Additive, and

the clean water, checking to ensure a tight and complete seal has been made on the

Water Bladder.

WARNING! The unit will leak if you do not ensure that the water bladder is sealed.

4)

Fold over the top of the Water Bladder and zip the cooler bag pack closed.

5)

Using the properly adjusted waist belt, attach the system to your waist.

6)

Turn the belt so that the packs are located on your left side for easy connection and

installation of the COOLSHIRT or Active Aqua Vest. With all connections made turn the

waist belt to place the pack in a comfortable position.

7)

Connect the battery and press the “ON”, you should feel  a slight vibration and hear a

low hum.

8)

Within 30 seconds you will feel the COOLSHIRT or Active Aqua Vest begin to cool

indicating proper connections and installation of the systems components.

Maintenance:

1)

After each use of the system the unit should be drained. Open the Water Bladder and

pour out contents of the system.

2)

Connect lithium battery to the charger and re-charge the battery pack.

Отзывы: