
!
C 790K
103
GB
478
200**
700
1100
261
50**
Fire-retardant wall of
brick or concrete
900
900
311
593
50**
636
Fire-retardant wall of
brick or concrete
100
361
643
100
707
Combustible wall
407
211
A 1270*
139
B 1180*
C 574
72
Ø150
Air inlet Ø67
D 588
556
1593
2300*
126*
Combustible roof
INSTALLATION DISTANCES
* If the stove is placed on a hearth plate made of glass for example (accessory), the height from the floor is affected by a distance corresponding to the thickness of the hearth plate. Also applies to
separate glass hearth plates (accessory).
** To prevent discolouration of painted non-flammable walls we recommend that the same side distance as to combustible walls is used.
The minimum distance in front of
the stove opening to combustible
parts of the building or interior
decoration must be at least 1 m.
The dimension diagrams only
show the minimum permitted
installation distances for the
stove. When connecting to a steel
flue, also note the safety distance
requirements of the flue. The
safety distance between an un-
insulated flue and a combustible
part of the building should be at
least 300 mm.
Installation distances
A =
height from floor to
chimney connection
upwards
B =
height from floor to c/c
chimney connection rear
C =
height from floor to air inlet
D =
height from floor to lower
edge of hatch
A separate glass hearth
plate (accessory)
increases the connection
height to the chimney by
10 mm.
678
400
479
479
311
100
Combustible wall
Permitted area
for combustible
parts of the
building
Содержание C 790K
Страница 1: ...www contura eu C 790K Installation instructions...
Страница 9: ...4 6 5 105 GB ASSEMBLY...
Страница 10: ...8 7 9 90 10 2 3 4 1 2 1 106 GB ASSEMBLY...
Страница 11: ...107 GB ASSEMBLY...
Страница 12: ...2 1 10 10 VANA DIUM No 7 CHROME 108 GB ASSEMBLY Installing suspension profiles...
Страница 13: ...3 4 109 GB ASSEMBLY...
Страница 14: ...6 5 10 10 VAN ADI UM No 7 CH RO M E 2 1 90 110 GB ASSEMBLY...
Страница 15: ...7 8 111 GB ASSEMBLY...
Страница 16: ...2 3 mm 1 2 3 4 3 mm 112 GB ASSEMBLY Installing tiles...
Страница 17: ...5 7 6 113 GB ASSEMBLY...
Страница 18: ...8 9 114 GB ASSEMBLY...
Страница 19: ...1 2 3 4 115 GB ASSEMBLY Installing heat tank stone on top...
Страница 22: ...1 2 3 118 GB ASSEMBLY Installing the base door...
Страница 23: ......