Contura C 790K Скачать руководство пользователя страница 1

www.contura.eu

C 790K

Installation 

instructions

Содержание C 790K

Страница 1: ...www contura eu C 790K Installation instructions...

Страница 2: ...ECLARED PERFORMANCE Essential characteristics Performance Harmonised technical specification Reaction to fire A1 WT Minimum distance to combustible material 100 mm to rear 400 mm to side Other safety...

Страница 3: ...as this will affect the routines for regular chimney sweeping services List of Contents Technical details 100 Prior to installation 100 Connection to chimney 101 Supply of combustion air Option 102 I...

Страница 4: ...suitable fitters Building application These main instructions may give guidance which would contravene national building regulations Please refer to supplementary instructions or ask your local autho...

Страница 5: ...of the connection sleeve is 150 mm The stove requires a draft in the chimney of at least 12 Pa The draft is affected both by the length and area of the chimney and by how well sealed it is The minimum...

Страница 6: ...and a correspondingly larger wall vent must be selected In hot areas the duct should be insulated with 30 mm mineral wool covered with a moisture inhibitor plastic It is important that the lead in be...

Страница 7: ...combustible walls is used The minimum distance in front of the stove opening to combustible parts of the building or interior decoration must be at least 1 m The dimension diagrams only show the minim...

Страница 8: ...A DIUM No 7 CH RO ME x 5 x 5 10 10 VANADIUM No 7 CHROME 1 3 2 10 10 VANA DIUM No 7 CHROME 104 GB ASSEMBLY Installing heat tank stone If the stove cannot be equipped with the heat tank stone advance to...

Страница 9: ...4 6 5 105 GB ASSEMBLY...

Страница 10: ...8 7 9 90 10 2 3 4 1 2 1 106 GB ASSEMBLY...

Страница 11: ...107 GB ASSEMBLY...

Страница 12: ...2 1 10 10 VANA DIUM No 7 CHROME 108 GB ASSEMBLY Installing suspension profiles...

Страница 13: ...3 4 109 GB ASSEMBLY...

Страница 14: ...6 5 10 10 VAN ADI UM No 7 CH RO M E 2 1 90 110 GB ASSEMBLY...

Страница 15: ...7 8 111 GB ASSEMBLY...

Страница 16: ...2 3 mm 1 2 3 4 3 mm 112 GB ASSEMBLY Installing tiles...

Страница 17: ...5 7 6 113 GB ASSEMBLY...

Страница 18: ...8 9 114 GB ASSEMBLY...

Страница 19: ...1 2 3 4 115 GB ASSEMBLY Installing heat tank stone on top...

Страница 20: ...nal inspection of the installation It is extremely important that the installation is inspected by an authorised chimney sweep before the stove is used Also read the Lighting instructions before light...

Страница 21: ...ks Handle the vermiculite with care Lift the smoke baffle with one hand whilst removing the sides The side posts need not be removed when sweeping Reinstall in reverse order REMOVAL Removing the loose...

Страница 22: ...1 2 3 118 GB ASSEMBLY Installing the base door...

Страница 23: ......

Страница 24: ...tura reserves the right to change dimensions and procedures described in these instructions at any time without special notice The current edition can be downloaded from www contura eu NIBE AB Box 134...

Отзывы: