
GB
77
3 mm
419 mm
See page 78 for installation of heat reservoir.
If a fan is to be installed, it has
to be done before the lower
front stone is put in place.
Attach the adjustment brackets to the upper concrete screws.
Adjust the stone so it is aligned with the side stones along the
top edge. Tighten the 4 concrete screws.
!
!
Check that the distance between the door and top front stone
is approx. 4 mm. If necessary, the insert's feet can be adjusted
so there is an even gap between both of the front stones and
the door.
12
13
14
15
INSTALLATION
Содержание C 34T
Страница 1: ...Installation instructions C 34T www contura eu...
Страница 11: ...GB 75 10 10 VAN ADI UM No 7 CH RO M E Do not tighten the screws 3 4 5 6 7 INSTALLATION...
Страница 14: ...GB 78 Heat reservoir to soapstone top Installation of accessories Heat reservoir 1 2 3 4 INSTALLATION...
Страница 15: ......