![ControlOMatic CHLOR MAKER 10 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/controlomatic/chlor-maker-10/chlor-maker-10_operating-instructions-manual_2658898006.webp)
4. Find 24 Circulation Plumbing:
Locate the continuous (24 Hour) circulating pump and the 3/4 inch tub
-
bing connected to the pump. The ChlorMaker cell should be installed on the OUTPUT side of the pump. The
tube will need to be cut and reconnected to the ChlorMaker cell. Refer to DIAGRAM 2 Item (B). Additional
tubing may be needed if the existing tube is not long enough or is hard to access. Additional tubing is avail
-
able at most hardware stores. The location of the cell should have no obstructions at the cable end of the cell
to allow for cell removal, replacement and cleaning.
5. Fasten ChlorMaker Cell:
Find a location near the OUTPUT side of the continuous (24 Hour) circu
-
lating pump where the tube can be cut and reconnected to the cell. The location should be visible
to allow for inspection of the titanium plates through the clear part of the cell. The location should
also have no obstructions at the cable end of the cell to allow for removal of the cell plates if plate
cleaning is needed. Mount the cell using the two supplied brackets shown in DIAGRAM 2 Item (A).
Cell Orientation: The cell must be mounted vertically to prevent chlorine gas from being
trapped in the cell.
6. Connect Tubing To Cell:
Cut the existing tube and reconnect the ends to the two 3/4 inch barb fit
-
tings on the cell. Use the supplied clamps at (B) to securely fasten the tube to the barbs on the cell.
Note that some water will spill from the cut tube even though the spa has been drained or shut-off.
DIAGRAM 2