background image

17

W415-0149 / B / 11.25.09

REPLACEMENT BLOWER

Blower replacement may be done through either the fire-
box or from the rear of the unit. Using the rear panel is
recommended.

1.  Turn off the electrical power and the gas supply to the
stove.

INSTALLATION THROUGH THE REAR

PANEL :

FOR MODEL CDVS280

2.  Remove the two combustion air covers and gaskets
held on with 4 screws each. Remove the rear panel held in
place with 6 screws.

3. Remove the 2 screws holding the blower to its mounting
plate. Disconnect the two blower wires.

4. Replace the blower and reconnect the two wires. When
replacing the rear panel, ensure that the wires are neither
pinched nor interfere with the blower operation. Ensure
that the combustion air cover plates and gaskets are prop-
erly installed and sealed.

FOR MODEL CS280

2. Remove the 8 screws securing the air intake manifolds
to the rear panel. Remove the rear panel held in place with
6 screws.

3. Remove the 2 screws holding the blower to its mounting
plate. Disconnect the two blower wires.

4. Replace the blower and reconnect the two wires. When
replacing the rear panel, ensure that the wires are neither
pinched nor interfere with the blower operation. Resecure
the air intake manifolds.

INSTALLATION THROUGH THE FIRE-

BOX:

Replacement blower access gasket is required.

2. Open the lower control door, the two side doors, and the
fire viewing door. Remove the logs.

3. Remove the blower access plate held on with 6 screws.

4.  Disconnect the two blower wires. Remove the blower
bracket held on with 2 screws.

5. Replace the blower using the existing bracket. Replace
the bracket/blower assembly on the unit.

6. Reconnect the two wires. Hold the replacement gasket
in place and reattach the blower access plate. Replace the
logs. Close all doors.

Turn the gas supply and electricity back on.

Because the blower is thermally activated, when turned
on, it will automatically start approximately 15-30 min-
utes after lighting the stove and will run for approximately
30-45 minutes after the stove has been turned off. Use
of the fan increases the output of heat.

Drywall dust will penetrate into the blower bearings caus-
ing irreparable damage and must be prevented from
coming into contact with the blower or its compartment.
Any damage resulting from this condition is not cov-
ered by the warranty policy.

INSTALLATION FROM THE FRONT

 INSTALLATION FROM THE REAR

BLOWER

SCREWS

AIR INTAKE MANIFOLDS

Содержание CDVS 280-N

Страница 1: ...ada L4M 4Y8 705 721 1212 Installation and service must be performed by a qualified installer service agency or the gas supplier WARNING If the information in these instructions is not followed exactly...

Страница 2: ...or clothing ignition Supervise young children when they are in the same room as the stove Due to high temperatures the stove should be located out of traffic and away from furniture and draperies Clot...

Страница 3: ...ty repair is not covered Any labour related to warranty repair is not covered Any labour related to warranty repair is not covered CONDITIONS AND LIMITATIONS WOLF STEEL LTD warrants its products again...

Страница 4: ...gas and 13 inches water column for propane When the valve is set to HI the manifold pres sure under flow conditions is 3 5 inches water column for natural gas and 10 inches water column for propane W...

Страница 5: ...ing LOCATIONANDCLEARANCES Provide adequate ventilation and combustion air Provide adequate accessibility clearance for servicing and operating the stove Never obstruct the front opening of the stove C...

Страница 6: ...combined OFFSET INSTALLATION EXAMPLE If a first run of 72 inches is re quired using the First Vent Run on the chart shows that a maxi mum second run of 48 inches is allowable IF NECESSARY THE FIRST R...

Страница 7: ...Clearance above grade veranda porch deck or balcony Clearance to windows or doors that open Clearance to permanently closed windows Vertical clearance to ventilated soffit located above the terminal w...

Страница 8: ...lled in its final position apply sealant between the pipe and the firestop spacer 3 In the attic after the pipe has been installed slide the vent pipe collar down to cover up the open end of the shiel...

Страница 9: ...ts onto the air terminal Tighten securely 6 Attach the vertical rain cap 7 In the attic slide the vent pipe collar down to cover up the open end of the shield and tighten This will prevent any materia...

Страница 10: ...f the base For mobile home installations the fireplace must be fastened in place Use 10 screws inserted through the holes in the base to se cure It is recommended that the fireplace be secured in all...

Страница 11: ...n with the screw supplied 7 Unscrew the wire access cover plate from the rear right hand side of the firebox Remove and discard the gasket Remove the knockout from the cover plate and insert the prote...

Страница 12: ...roof or building within 10 feet This is a guideline only local venting codes should be followed which may differ in height and clearance require ments Continue with Gas Installation Page 13 INSTALLING...

Страница 13: ...PPLIQUENT SEULEMENTAU CANADA AFUE NG LP GN GP 64 65 MINIMUM AND MAXIMUM HORIZONTAL VENT LENGTHS ARE 25 INCHES AND 20 FEET RESPECTIVELY LES LONGUEURS HORIZONTALES MINIMALE ET MAXIMALE SONT 25 POUCES ET...

Страница 14: ...t to ensure that it is in a horizontal position To open the door repeat in reverse order Place the front log on the ember screen lining up the studs with the holes on the bottom of the log HINGE PIN B...

Страница 15: ...Allow several minutes 5 15 for the flame to stabilize after ignition MODEL CS280 ONLY SPILL SWITCH This is a thermally activated switch attached to the back of the chimney adapter which senses the cha...

Страница 16: ...VICING THE APPLIANCE CAUTION Label all wires prior to disconnection when serv icing controls Wiring errors can cause improper and dan gerous operation Verify proper operation after servicing This stov...

Страница 17: ...at the wires are neither pinched nor interfere with the blower operation Resecure the air intake manifolds INSTALLATION THROUGH THE FIRE BOX Replacement blower access gasket is required 2 Open the low...

Страница 18: ...curing the control panel plate To access the venturi remove the 2 screws securing the air housing cover plate Take care not to damage the gasket Natural gas and propane models have air shutters set fu...

Страница 19: ...RE BRTC7 BRASS TRIM COLLAR BM6724 24 STOVE PIPE 7 DIAMETER W10 0300 10 ALUMINUM FLEX LINER C W SPACERS 4 DIA W25 0001 DECORATIVE BRASS BAND GD180 PERISCOPE TERMINAL KIT BM6790 90 ELBOW 7 DIAMETER GD20...

Страница 20: ...660 009 ON OFF SWITCH W690 0002 THERMODISC W380 0002 VARIABLE SPEED SWITCH KNOB KB 13 VARIABLE SPEED SWITCH GZ 552 REPLACEMENT BLOWER CS280 W010 0459 ADAPTER C W SPILL SWITCH W660 0006 SPILL SWITCH AC...

Страница 21: ...s to code Correct all undersized piping MODEL CS280 ONLY Venting is spilling test with spill switch bypassed Replace if defective check for vent blockage Pilot flame is not large enough turn up the pi...

Страница 22: ...rrect location of storm collars Incorrect installation Carbon is being de posited on glass logs or combustion chamber surfaces Flame is impinging on the logs or combustion chamber check that the logs...

Страница 23: ...W415 0149 B 11 25 09 Wolf Steel Fireplace Service History This fireplace must be serviced at least annually depending on usage Date Service Technician Name Service Performed Special Concerns Dealer Na...

Страница 24: ...24 W415 0149 B 11 25 09 NOTES...

Отзывы: