![Conti Monaco MC Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/conti/monaco-mc/monaco-mc_technical-documentation-manual_2656561062.webp)
Edition 05/2021 - MC – Technical documentation - page
62
SACOME, CONFIDENTIAL Document, it is forbidden to duplicate or communicate this document without previous authorization.
A24
Coffee boiler 1 time out alarm
- Time allocated to the coffee
boiler 1 heating exceeded.
- Check the t° probe
- Check the probe connection
- Check the electronic board
- Check the heater and the relay
- Check the programmed heating time
- Check the relay control box
A25
Coffee boiler 2 time out alarm
- Time allocated to the coffee
boiler 2 heating exceeded.
- Check the t° probe
- Check the probe connection
- Check the electronic board
- Check the heater and the relay
- Check the programmed heating time
- Check the relay control box
A26
Coffee boiler 3 time out alarm
- Time allocated to the coffee
boiler 3 heating exceeded.
- Check the t° probe
- Check the probe connection
- Check the electronic board
- Check the heater and the relay
- Check the programmed heating time
- Check the relay control box
A27
Flow meter 1 time out alarm
- No flowmeter 1 pulse after 5
seconds
- Check the flowmeter (flashings)
- Check the flowmeter connection
- Check the electronic board
- Check for clogged coffee group
A28
Flow meter 2 time out alarm
- No flowmeter 2 pulse after 5
seconds
- Check the flowmeter (flashings)
- Check the flowmeter connection
- Check the electronic board
- Check for clogged coffee group
A29
Flow meter 3 time out alarm
- No flowmeter 3 pulse after 5
seconds
- Check the flowmeter (flashings)
- Check the flowmeter connection
- Check the electronic board
- Check for clogged coffee group