background image

 

 

to  EC  Np.  842/2006  Article  3.  The  ability  of  the  LES-RACK-M1  equipment  to  continuously  perform 
effectively completely depends on adequate servicing and regular testing. The LES-RACK-M1 equipment 
must only be inspected by persons who meet the required qualification conditions. These persons must 
not interfere with the circuits, parts linked with the network under the cover under any circumstances 
because  there  the  risk  of  an  electric  shock.  Repairs  must  only  be  carried  out  by  properly  trained 
employees  of  the  service  organization  or  the  manufacturer.  Before  the  inspection,  the  person 
responsible for the  operation of equipment  must  be informed about the  inspection of the equipment 
LES-RACK-M1. Before the inspection and commissioning, related equipment, if any  is connected, must 
be prevented from running, e.g. disconnecting energy, fire valve, air conditioning unit.  
The equipment must be inspected after each use or if the permitted working limits are exceeded. 

Inspections by the user 

Consistent  adherence  to  the  inspection  time  schedule  and  maintenance  is  carried  out  to  ascertain 
defects  in  the  LES-RACK-M1  equipment  in  the  initial stage.  Allows  correction  before  the  equipment  is 
automatically activated and error-free function in the case of fire. The inspections  of equipment must 
always prove conformity with the general requirements and technical parameters in this manual.    

 

Inspection after 1 week 

Visual inspection of any risk changes and the tightness of the protected space that would decrease the 
efficiency of the system. Visual inspection to see that the operating equipment and components of the 
system are properly located and undamaged.  
Inspection of signal lamps on the front panel 

 

Inspection after 1 month 

Checking  that  all  staff  who  could  work  with  equipment  are  properly  trained  and  have  appropriate 
qualifications.  In  particular  that  new  employees  were  familiarized  with  the  use  and  operation  of  the 
system. 

 

Checking the protected space 

At least each month consistently check that there are no passages in the borders of the protected space 
or that other changes have not occurred that could influence the escape of the extinguishing agent or its 
efficiency. If it is ascertained that in the protected space changes in the volume or the type of the risk 
have occurred, the extinguishing system must be modified so it provides the original level of protection. 
It is recommended the type of the risk in the protected space and the volume which is occupied. It is 
recommended to regularly check that the extinguishing agent is at the required concentration and will 
be kept. 

 

Inspections by the service organization 

Repairs must only be carried out by properly trained employees of the service organization with electric 
systems qualifications according to the respective regulations. 
All electric detection and alarm systems are tested according to the recommendations of the respective 
national standards. 
All control valves are checked that they work correctly in manual operation and, consequently, that they 
work correctly for automatic operation. Checking the surface of the equipment for signs of damage or 
unauthorized interference. 
Visual inspection 

 

checking the equipment location  

 

checking the serial number 

 

checking equipment fixing  

 

checking equipment accessibility  

 

cleaning dirt from the system  

 

Notification:  The  producer  of  this  document,  reserves  the  right  to  change  the  contents  without  prior 
notification.

 

Содержание LES-RACK-M1

Страница 1: ...dures for assembling commissioning operating and maintenance of the LES RACK M1 fire extinguisher The equipment must only be used for the described applications with the approved extinguishing agent F...

Страница 2: ...19 Temperatures 20 Mail 21 Outputs 21 Date and time 22 Logs 22 Download 22 INSTALLATION 23 General provisions 23 Safety provisions 23 Assembling the equipment 23 Filling adding extinguishing liquid 23...

Страница 3: ...g to the operating conditions and the maintenance plan In necessary the maintenance and service must be documented Device operators of must announce all changes and modifications of the monitored and...

Страница 4: ...n in Fig 1 The fire fighting equipment consists of Tank with extinguishing agent 1 consisting of non pressure stainless storage vessel 1 filled with the extinguishing agent FK 5 1 12 dodekafluor 2 met...

Страница 5: ......

Страница 6: ...he energy requirements of the system during extinguishing AC inlet 13 for connecting the DC source 14 to 230V AC distribution network Control board 16 the heart of the system It concentrates and evalu...

Страница 7: ...ress the micro switch to the left of the communication connector The internal relay is activated a click is heard and connects the battery to the system BATTERY G S De aerating the pump after adding f...

Страница 8: ...at the same time by switching the micro switch in the left lower part of the box which is accessible from the bottom after partially ejecting the box about 5 cm from the 19 frame BATTERY R S50 Extingu...

Страница 9: ...with the cap connect the external equipment on the rear face and insert the equipment back into the frame Secure The system error signal goes off FAULT SYSTEM Press TEST MUTE the pump is activated th...

Страница 10: ...would escape outside the monitored space and its concentration for effectively extinguishing a fire would be insufficient The integrity of the circuit of the door contact is continuously monitored Th...

Страница 11: ...ectors or other extinguishing equipment The inputs marked with the text Sensor 1 to Sensor 3 are for this The sensitivity of the external sensors circuits is also continuously monitored The connection...

Страница 12: ...the network EXTINGUISHING R S50 3 seconds delay before extinguishing activated R S Extinguishing in progress or terminated Y S Extinguishing blocked door open FAULT SENSOR R S Fault sensor PUMP G S Th...

Страница 13: ...operators by the extinguishing agent as well as decomposition products mainly by regular training The start of the fire extinguisher may be accompanied by a loud noise that could cause fright but not...

Страница 14: ...isplayed To repeat the login close the browser and run it again it is its property and it is not possible to do otherwise NOTE Transferred login data is not encrypted ATTENTION The display may not be...

Страница 15: ...state is displayed when MAJOR system error MINOR is in yellow The battery is disconnected from the system but it is present The fan is not rotating The level is low Here the state is displayed when Th...

Страница 16: ...Network...

Страница 17: ...IP address exchange address Gate must be typed even if it is not used Primary and secondary DNS if mail is used SNMP trap1 2 IP SNMP address of the server...

Страница 18: ...ed Group extinguish group for common extinguishing If the exchanges have the same group with the exception of 0 if extinguishing is activated on any of them extinguishing on the others is activated Us...

Страница 19: ...or failure sends the trap Mail change of the state or error sends e mail Error Major error is assigned to Major Error Minor error is assigned to Minor State Major the state is assigned to Mirror Stat...

Страница 20: ...he line and press the Read sensor button and press the Save button Then select the temperature type the line disconnect the first sensor and connect the second sensor read serial number and save Repea...

Страница 21: ...User Password SMTP server requires login To addressee of the mail From sender of the mail must be typed Subject Subject of the message Outputs Relay_ window used to change the name of the output The n...

Страница 22: ...Date and time Logs Lists events from the newest to the oldest Download MIB opens the MIB file window LOG opens events window...

Страница 23: ...the box From the front the skid has 3 holes with M5 threads with the same pitch as the 1U drilling in the 19 bar Fix the bar to the rear wall of the front 19 bar using the conical headed M5 bolt The r...

Страница 24: ...network and operated connect the battery It must be connected for at least 12 hours to charge the backup source battery After charging the equipment must be disconnected and then it is possible to pu...

Страница 25: ...are properly located and undamaged Inspection of signal lamps on the front panel Inspection after 1 month Checking that all staff who could work with equipment are properly trained and have appropriat...

Отзывы:

Похожие инструкции для LES-RACK-M1