Consort DF2SL heatflow Скачать руководство пользователя страница 5

D F 2 S L   H E A T F L O W :   I N S T A L L A T I O N   G U I D E

 

 

5

 

Step 17: 

Tighten the two screws in the keyhole slots. 

Ensuring not to over tighten. 

 

(17)

 

Step 18: 

It is possible to bend or move the LED indication light 

when installing. Check this is straight and pointing away from 
the wall. 

 

(18)

 

(19)

 

Step 19: 

Install the lid, this must be inserted at the 

bottom and hinged upward. 

 

(20)

 

Step 20: 

Place the lid on the heater and ensure that you have 

not clamped any leads. Using the screws in the screw pack, fix 
the lid using the 3 fixing points.

 

(21)

 

Step 21: 

Insert the screw covers if required. 

 

(22)

 

Step 22: 

Wire the end of your flex into the Fused connection 

unit. This heater must be permanently connected to the 
electricity supply via a double pole switch having 3mm gap on 
each pole. There are no exceptions. A switched Fused 
Connection unit to BS.1363 is recommended. 

 

Содержание DF2SL heatflow

Страница 1: ...egal rights The correct electricity supply voltage is shown on the rating label attached to the appliance Reasonable care has been taken to ensure that this guide is accurate at the time of printing In the interest of progress Consort reserves the right to vary specifications without notice OVERVIEW Please read this guide carefully and retain for future reference and maintenance This appliance has...

Страница 2: ...ard packing is small screw pack keep this safe 1 2 Step 3 Remove the lid there is one screw holding this in place The lid hinges from the grill Step 4 For fixing there are two keyhole slots and one securing hole keyhole slots securing hole 3 4 5 Step 5 Put the heater in position and mark all fixing points ...

Страница 3: ...6 Step 7 Select most appropriate fixing method 7 8 Step 8 Depending on wall construction drill holes for appropriate fixing 9 Step 9 Insert two screws in the keyhole fixing points Leave approximately 15mm of the head exposed Step 10 Using 1 5mm2 flex cut the length required and strip the end 10 ...

Страница 4: ...er marked L N This heater is double insulated and does not require earth 12 13 Step 13 Check connections un pack cable clamp and two screws from the screw pack 14 Step 14 Clamp the cable 15 Step 15 Place the heater on the two screws using the key hole slots 16 Step 16 Fix top screw ensuring not to clamp the mains cable Do not over tighten as the screw can pull through the plastic ...

Страница 5: ...at the bottom and hinged upward 20 Step 20 Place the lid on the heater and ensure that you have not clamped any leads Using the screws in the screw pack fix the lid using the 3 fixing points 21 Step 21 Insert the screw covers if required 22 Step 22 Wire the end of your flex into the Fused connection unit This heater must be permanently connected to the electricity supply via a double pole switch h...

Страница 6: ...howing the 4 dots 24 25 Step 25 Switch power to the heater on and you should see a green light on the front of the heater You now have 20 seconds to pair the heater Please refer to the controllers user manual for pairing In this scenario we are using an SLPB controller 26 Step 26 Press and hold the button on SLPB The indicating light will change from green to amber in a rotating sequence to show t...

Страница 7: ...how green 27 Step 28 The heater is now connected and ready to use 28 Troubleshooting The fan is not spinning Solution Check lid fitment if not installed correctly it can clamp the impeller and stop it moving freely Slow red flashing light Solution the thermostat needs to be set higher as the room is warmer than the set temperature Fast red flashing red light Solution Is the lid on the heater If ye...

Отзывы: