User Guide  - Concrete Coneflow Skip

Item Number

Part Number

Description

Quantity

1

ZZ370006

Bale Arm for CA206-00500

1

ZZ370011

Bale Arm for CA206-00750

ZZ370021

Bale Arm for CA206-01000

2

ZZ960027

5mm Split Pin

2

Product Information

Parts Diagram

Concrete Coneflow Skip

NOTE: These parts are for this model, they may differ for previous versions. Please contact Conquip with any queries.

Original Working Instructions

Usage Instructions 

Important Usage Notes

• 

The bale arm must be secured against dropping / swinging down whenever 

the unit is not in use. This includes during transportation to and from site and 

when loading and unloading from any vehicle.

• 

The securing chain should be attached when the unit is in its horizontal 

position and the bale arm is raised by the attached lifting equipment.

• 

Tag lines should be used but only to allow for light manoeuvring.

• 

The bale arm should not be lifted by hand, do not attempt to lift manually.

• 

It is recommended that you apply skip wax to the skip to assist cleaning. This 

is available from Conquip.

Usage Instructions

1.  Attach the lifting apparatus’ hook to the skip’s bale arm lifting point. Always 

ensure that the hook’s gate is correctly closed and the bale arm is seated 

correctly in the hook.

2.  Ensure the skip’s flow gate is fully closed and secured.

3.  Raise the Concrete Coneflow Skip and carefully manoeuvre to concrete filling 

location.

4.  Lower the skip to the ground with the mouth of the skip nearest the concrete 

lorry. When the roll frame comes into contact with the ground, it will assist 

the skip into a horizontal position.

5.  When the skip is in its lowered position, resting on the roll frame, lower the 

bale arm forward, out of the way of the large opening.

6.  Fill the skip at the hopper end with concrete until the skip is full and the load 

is level. The skip can now be raised and moved to where it is required.

7.  To aid manoeuvring, attach control tag to the skip.

8.  Carefully raise the skip just off the ground and check for balance and security.

9.  Carefully move the load to its required position. Move slowly and carefully; 

do not jolt the load.

10.  When in position, lower the load until suspended above the discharge point.