Connecticut Electric EmerGen Switch 10-7501G2 Скачать руководство пользователя страница 13

Product Warranty 

Every EmerGen Switch is guaranteed against mechanical or electrical failure due to 
manufacturing defects for a period of 

five

 year

s

 from the date of purchase. 

Connecticut Electric warrants to the purchaser that this product will be free from defects 
in material and workmanship and will be of the kind and quality designated. This 
warranty shall apply only to defects appearing within one year of the original date of 
purchase. 

Defective products are to be returned to the place of purchase for an exchange or 
refund. 

Connecticut Electric will not be liable for any loss, damage, incidental or consequential 
damage of any kind, whether based upon warranty contact, or negligence, and/or arising 
in connection with the sale, use, installation or repair of this product. Connecticut 
Electric’s maximum liability shall not, in any case, exceed the contract price for the 
products claimed to be defective or unsuitable. 

This warranty does not extend to any product manufactured by Connecticut Electric 
which has been subjected to misuse, neglect, accident, improper installation or use in 
violation of instructions furnished. 

This warranty does not extend to or apply to any unit which has been repaired or altered, 
either to the product or to the components manufactured by any other supplier other 
than Connecticut Electric. 

If you require assistance, contact out Customer Help Line at (800) 

730-2557 Ext. 200

13

Содержание EmerGen Switch 10-7501G2

Страница 1: ...sfer Switch PLEASE READ THIS MANUAL IN ITS ENTIRETY BEFORE INSTALLING AND OR OPERATING YOUR EmerGen Switch EmerGen Switch RETAIN THIS MANUAL FOR FUTURE REFERENCE Corporate Office 1819 W 38th Street Anderson IN 46013 Phone 1 800 730 2557 Fax 765 608 5036 www connecticut electric com Conforms to standards UL 1008 and CSA C22 2 no 178 2 and NEC Article 702 January 2020 ...

Страница 2: ...ian or qualified professional to install safe for a homeowner to operate and will work with 120 240V single phase AC generators factory equipped with NEMA type receptacles L14 20R or L14 30R Your EmerGen Switch cannot permit connection to both utility and generator power at the same time eliminating the possibility of back feeding Product Outline Specifications Page 3 Safety Information Installati...

Страница 3: ...ttention Une mauvaise installation de ce commutateur de transfert pourrait causer des dommages ou des blessures par électrocution ou d incendie L installation doit être effectuée par un électricien agréé ou qualifié conformément aux codes électriques Inspection de l installation par l autorité de contrôle local est nécessaire Les dossiers d inspection doivent être conservés pour créances d assuran...

Страница 4: ...the power cord set into your generator and into the power inlet box before starting the generator and always shut the generator down before detaching the power cord set 5 Do not overload your generator or its circuit breakers will trip Using the EmerGen Switch s built in watt meters you can balance the loads to avoid impeding your generator s performance INSTALLATION PREPARATION 1 Decide which cir...

Страница 5: ...ater Heater 3500 0 TYPICAL INSTALLATION WATTAGE REQUIREMENTS 1 Most appliances and motors have current ratings noted directly on the units Light bulb wattages are noted on the bulb 2 Some electrical motors surge in power when first started Your EmerGen Switch has watt meters so you can monitor the flow of these start up surges without impeding your generator s performance 3 Load balance is obtaine...

Страница 6: ...rcuit models 1 1 4 for the 10 circuit model 7 Insert the wires from the conduit through the knockout taking care not to nick or gouge the wires on the metal edge Slide the locknut over the loads and tighten securely onto the conduit fitting 8 Without over manipulating the flex conduit secure your EmerGen Switch to the wall with fasteners appropriate for the wall s construction If you are mounting ...

Страница 7: ...nd both the red and black EmerGen Switch wires labeled A Using good workmanship route both of these wires close to the selected circuit breaker a The red EmerGen Switch A wire is trimmed stripped and installed into the circuit breaker securely tightening the breaker lug b The black EmerGen Switch A wire and the hot wire from the circuit breaker removed in step 1 are placed up the side of the load ...

Страница 8: ...r will be used a Start by removing the two load wires from the selected circuit breaker b The red EmerGen Switch E wire is trimmed stripped and securely installed into one side of the 2 pole circuit breaker c The black EmerGen Switch E wire and one of the hot wires from the circuit breaker are placed up the side of the load center Insert both wires into a an approved connector and fasten together ...

Страница 9: ...re appropriately Insert the wire into the hole in the ground bar and tighten securely NOTE If no separate Ground Bar exists connect the green wire to an unused position in the Neutral bar 3 Replace the load center cover All circuit breakers can now be turned on including the MAIN circuit breaker 4 All EGS switches should be in the Line position The Off position is generally not used 5 Fill out the...

Страница 10: ...stall four conductor Hot Hot Neutral Ground permanent wiring between the junction box and power inlet box according to local code requirements Recommended wire size is 12GA for 20 amp generators and 10GA for 30 amp generators Caution Locate inlet box a minimum of 10 feet away from any opening in the building that would allow carbon monoxide to enter the premises Connect the EmerGen Switch input wi...

Страница 11: ...y 10 minutes for your generator to warm up 5 At your EmerGen Switch move one circuit to the GEN position making a note of how much wattage is used on the watt meter While monitoring the load flip each circuit one at a time to the GEN position You do not need to go in order and you want to balance the loads so that both meters read approximately the same Attempt to balance the two meters to within ...

Страница 12: ...or circuit breaker has tripped 2 Reset circuit breaker 3 Poor connection or defective cord set 3 Check and repair 4 Connected device is bad 4 Select a different load or appliance in good condition 5 Fault in generator 5 Contact a qualified professional Appliances do not operate after utility power is restored 1 Switches are in GEN or OFF position 1 Move switches to LINE position 2 Circuit breaker ...

Страница 13: ...l or consequential damage of any kind whether based upon warranty contact or negligence and or arising in connection with the sale use installation or repair of this product Connecticut Electric s maximum liability shall not in any case exceed the contract price for the products claimed to be defective or unsuitable This warranty does not extend to any product manufactured by Connecticut Electric ...

Отзывы: