Congo Play MONKEY PLAYSYSTEM FORT Скачать руководство пользователя страница 17

PHASE  9 

TARP  SUPPORT  ASSEMBLY 

"STOP  IF  ADDING  WOOD  ROOF" 

STEP 1:  Gather parts and hardware shown in table 9. 

STEP 2:  Attach tarp support 'N' to fort upright 'A' with 

05/16" 

5 1/2" hex bolt and 05/16" split washer 

05/16" flat washer. 

STEP 3:  Attach tarp support 'MA' to fort upright 'A' with 

05/16" 

5 1/2" hex bolt and 05/16" split washer 

and 05/16" flat washer. 

*** Make sure roof support 'MA' are square 

and level before tigthening the hex bolts 

and moving to the next step. 

TABLE  9  - PARTS  AND  HARDWARE 

II>  LETTER  l>ESCRIPTION 

MA 

ENI>  TARP  SUPPORTS  (WITH  4  HOLES) 

TARP  SUPPORTS 

"5/16"  x  5  1/2"  HEX  BOLTS 

"5/16"  FLAT  WASHERS 

"5/16"  SPLIT  WASHERS 

"5/16"  T-NUTS 

L-BRACKET 

"5/16"  x  1  1/2"  LAG  SCREW 

1------

__ _j 

STEP 4:  Place L-bracket as shown above., 

mark the center of the hole and using a 

drill with a 03/16"  drill bit, drill a pilot 

hole to port upright 'A'. ***

I

y

ou have 

the wood roof upgrade use the roof support 

bracket in place of the L bracket.***

STEP 

5, 

Attach L-bracket to upr;ght 'A'  :- -

with 5/16" 

11/2" lag screw 

and 05/16" flat washer 

Tighten  lag  screw  by  hand. 

"5/16"x1  1/2"  LAG  SCREW 

� 

STEP 6:  Using a drill with 03/16"  drill bit, 

drill a pilot hole 2" deep to 

"5/16"  FLAT  WASHER 

L_ 

roof support 'MA'. 

1------

STEP 7:  Attach L-bracket to roof support 'MA' 

with 05/16" 

11/2" lag screw and 

05/16" flat washer. 

Tighten  lag  screw  by  hand. 

,------

QTY 

____ _j 

"5/16"x1  1/2"  LAG  SCREW 

1.1115/16"  FLAT  WASHER 

L __ 

__j 

Содержание MONKEY PLAYSYSTEM FORT

Страница 1: ...PACKACif 1 5HOWN MONKC Y PlAY5Y5ffM fORI A55 MB Y IN5fRUCflON5...

Страница 2: ......

Страница 3: ...t receive I I item I I I L__________FORT DECKLADDE SSEMB _____ _j A 4 x4 x96 FORT UPRIGHT B 4 x4 x96 FORT UPRIGHT C 2 x6 x93 FORT GROUND BEAM Al 4 x4 x96 SWING BEAM UPRIGHT BBB I 4 x6 x108 SWING BEAM...

Страница 4: ......

Страница 5: ...ANTITY p 2 x4 x45 WALL RAIL Q 2 x4 x20 WALL RAIL R I 2 x4x12 WALL RAIL s 12 1 x6 x45 FLOOR BOARD T 3 1 x6 x37 3 s END FLOOR BOARD u 10 1 x6 x37 3 8 ROCKWALL BOARD w 2 1 x4 x48 TARP END CAP X 1 1 x4 x4...

Страница 6: ...___I 05 16 x 1 3 4 HEX BOLTS 4 0 01 4 x 1 1 2 HEX BOLTS 10 0 03 8 x 4 LAG SCREW 14 0 05 16 x 3 LAG SCREWS 68 05 16 X 1 1 2 HEX BOLTS 2 05 16 X 1 1 2 LAG SCREWS 18 UI 12 x 3 PAN HEAD SCREWS 2 12 x 1 P...

Страница 7: ...05 16 T NUTS 28 01 4 FLAT WAS HERS 19 8 L BRACKET 1 A FRAME BRACKET 0 03 8 FLAT WASHERS 15 05 16 SPLIT WASHERS 28 05 16 FLAT WASHERS 116 05 16 LOCK NUTS 2 20 STAR DRIVE BIT 1 6 STAKES 6 SWING HANGERS...

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ...16 x 3 LAG SCREWS 85 16 FLAT WASHERS TABLE 3 PARTS AND HARDWARE It LE TTER DESCRIPTION C FORT GROUND BEAM H SANDBOX BOAR G FLOOR CAPS 8 5 16 x 3 LAG SCREWS 85 16 FLAT WASHERS STEP 2 Attach fort ground...

Страница 12: ......

Страница 13: ...s STEP 3 Attach wall rails P to fort uprights A with 05 16 x 3 lag screws and 05 16 flat washers Three on each side 2 at the top and one at the bottom NOTE If attaching tower Package 3 or Package 4 do...

Страница 14: ......

Страница 15: ...N to this end z24 WALL SLATS 1 5 8 DECK SCREWS QTY 20 IQ DETAIL 6 STEP 1 Gather parts and hardware shown in table 7 STEP 2 Attach wall slats Z24 to wall rails J R Q with 1 5 8 deck screws See Detail 6...

Страница 16: ...ather parts and hardware shown in table 8 STEP 2 Attach wall slats Z24 to wall rails P with 1 5 8 deck screws See Detail 7 for spacing lo a DECK SCREW NOTE ____ If attaching tower z do not attach wall...

Страница 17: ...SPLIT WASHERS 5 16 T NUTS L BRACKET 5 16 x 1 1 2 LAG SCREW 1 1 I I I I I ___j STEP 4 Place L bracket as shown above mark the center of the hole and using a drill with a 03 16 drill bit drill a pilot...

Страница 18: ...in table 9 STEP 2 Attach tarp end caps W to end tarp support N and MA with 2 deck screws 2 DECK SCREWS TABLE 9 PARTS AND HARDWARE It LETTER DESCRIPTION w TARP END CAPS 8 x 2 DECK SCREW QTY 2 8 2 DECK...

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ...on of your Congo Play Set This is for use with the A Frame Square Bracket Attach the bracket to the bolt with the safety nut provided Then attach the Swing Beam with the RSS or Lag screw provided Once...

Страница 24: ...LAG SCREW 05 16 FLAT WASHERS TABLE 14 PARTS AND HARDWARE II LETTER l ESCRIPTION Al A FRAME UPRIGHT 000 A FRAME BRACE 05 16 x 3 LAG SCREWS 05 16 FLAT WASHERS 03 8 x 4 LAG SCREWS 03 8 FLAT WASHERS 03 8...

Страница 25: ......

Страница 26: ......

Страница 27: ...LETTER DESCRIPTION u ROCKWALL BOARDS 0 FORT ANGLE BRACE ROCKWALL SUPPORTS L BRACKETS ROCKWALL ROCKS 01 4 x 1 1 2 HEX BOLTS 05 16 FLAT WASHERS 01 4 T NUTS 05 16 x 1 1 2 LAG SCREWS 01 4 FLAT WASHERS 1...

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Отзывы: