background image

Step 1:

Install the foam pads [4 for

36” step, 12 for 74” step ] on the flat

spots located on the bottom edge of

sidewall.

Step 2:

Using a rubber mallet install

one of the 3” supports into the slot

located on the bottom of sidewall.

[36” step will have 2 sidewall, 74” will

have 4 sidewall]. Install one plug into

each sidewall.

Step 3:

Turn the step assembly over

and finish installing the 3” supports,

[6 for 3-step, 8 for 4-step] into the front

and back slots of each step location .

Step 4:

Using a rubber mallet, install

the four handrail posts into the middle

slots of the top two step locations on

the left sidewall, and the top two step

locations of the right sidewall. Handrail

posts must be seated into the slots.

Step 7:

Secure handrails using 1- # 10 x

1¼” screw into each post at pre-marked

locations.

Step 8:

Install the steps [finished edge

out] by placing over the male lugs on the

step sidewall and hitting downward with a

rubber mallet.

Step 5:

Install towel rack/cup holder

over the handrail posts with the towel rack

to the outside of step, tap in place using

the rubber mallet. Towel rack/cup holder

may be positioned anywhere on the post.

Step 6:

Tap the handrails into the

handrail posts.

Confer - Signature Spa Steps

ASSEMBLY AND INSTRUCTION MANUAL

NOTE: STEP PARTS ARE DESIGNED FOR A TIGHT FIT, USING LIQUID SOAP
DETERGENT WILL MAKE ASSEMBLY EASIER.

MADE IN THE U.S.A. BY:

Signature spa step 3-00-SSS-1 12/13

Printed in U.S.A.

97 Witmer Road
North Tonawanda, NY USA 14120-2421
800-635-3213
Fax: 716-694-3102
www.conferladders.com
email: [email protected]

Confer_SigSpa-US-12-13r3:layout  12/26/13  4:12 PM  Page 2

Отзывы: